Exam 5: Systems Development and Program Change Activities
Exam 1: Auditing and Internal Control100 Questions
Exam 2: Auditing IT Governance Controls91 Questions
Exam 3: Auditing Operating Systems and Networks105 Questions
Exam 4: Auditing Database Systems100 Questions
Exam 5: Systems Development and Program Change Activities94 Questions
Exam 6: Transaction Processing and Financial Reporting Systems Overview98 Questions
Exam 7: Computer Assisted Audit Tools and Techniques82 Questions
Exam 8: Data Structures and Caatts for Data Extraction81 Questions
Exam 9: Auditing the Revenue Cycle97 Questions
Exam 10: Auditing the Expenditure Cycle100 Questions
Exam 11: Enterprise Resource Planning Systems90 Questions
Exam 12: Business Ethics, Fraud, and Fraud Detection84 Questions
Select questions type
Which technique is least likely to be used to quantify intangible benefits?
(Multiple Choice)
4.9/5
(43)
List two ways that a systems project can contribute to the strategic objectives of the firm.
(Essay)
4.8/5
(40)
New system development activity controls must focus on the authorization, development, and implementation of new systems and its maintenance. Discuss at least five control activities that are found in an effective system development life cycle.
(Essay)
4.8/5
(40)
The output of the detailed design phase of the Systems Development Life Cycle (SDLC) is a
(Multiple Choice)
4.7/5
(44)
The Systems Development Life Cycle (SDLC) concept applies to specific applications and not to strategic systems planning.
(True/False)
4.9/5
(39)
Discuss the advantages and disadvantages of the three methods of converting to a new system: cold turkey cutover, phased cutover, and parallel operation cutover.
(Essay)
4.8/5
(21)
Which control ensures that production files cannot be accessed without specific permission?
(Multiple Choice)
4.7/5
(33)
Which control is not associated with new systems development activities?
(Multiple Choice)
5.0/5
(40)
Instead of implementing an application in a single big-bang release, modern systems are delivered in parts continuously and quickly
(True/False)
4.8/5
(43)
Classify each of the following as either a one-time or recurring costs:
training personnel
initial programming and testing
system design-one
hardware costs
software maintenance costs
site preparation
rent for facilities
data conversion from old system to new system
insurance costs
installation of original equipment
hardware upgrades
(Essay)
4.9/5
(50)
The user test and acceptance procedure is the last point at which the user can determine the system's acceptability prior to it going into service.
(True/False)
4.8/5
(29)
System documentation is designed for all of the following groups except
(Multiple Choice)
4.9/5
(39)
Why is the payback method often more useful than the net present value method for evaluating systems projects?
(Short Answer)
4.8/5