Exam 5: Systems Development and Program Change Activities

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Explain the role of accountants in the conceptual design stage.

(Essay)
4.8/5
(39)

Which technique is least likely to be used to quantify intangible benefits?

(Multiple Choice)
4.9/5
(43)

A tangible benefit

(Multiple Choice)
4.7/5
(36)

What are the auditor's objectives relating to systems development?

(Essay)
4.8/5
(41)

List two ways that a systems project can contribute to the strategic objectives of the firm.

(Essay)
4.8/5
(40)

Project planning includes all of the following except

(Multiple Choice)
4.9/5
(32)

New system development activity controls must focus on the authorization, development, and implementation of new systems and its maintenance. Discuss at least five control activities that are found in an effective system development life cycle.

(Essay)
4.8/5
(40)

List three methods used to control the source program library.

(Essay)
4.9/5
(40)

Typically a systems analysis

(Multiple Choice)
4.9/5
(30)

The output of the detailed design phase of the Systems Development Life Cycle (SDLC) is a

(Multiple Choice)
4.7/5
(44)

The Systems Development Life Cycle (SDLC) concept applies to specific applications and not to strategic systems planning.

(True/False)
4.9/5
(39)

Discuss the advantages and disadvantages of the three methods of converting to a new system: cold turkey cutover, phased cutover, and parallel operation cutover.

(Essay)
4.8/5
(21)

Which control ensures that production files cannot be accessed without specific permission?

(Multiple Choice)
4.7/5
(33)

An example of a tangible benefit is

(Multiple Choice)
4.7/5
(37)

Which control is not associated with new systems development activities?

(Multiple Choice)
5.0/5
(40)

Instead of implementing an application in a single big-bang release, modern systems are delivered in parts continuously and quickly

(True/False)
4.8/5
(43)

Classify each of the following as either a one-time or recurring costs: training personnel initial programming and testing system design-one hardware costs software maintenance costs site preparation rent for facilities data conversion from old system to new system insurance costs installation of original equipment hardware upgrades

(Essay)
4.9/5
(50)

The user test and acceptance procedure is the last point at which the user can determine the system's acceptability prior to it going into service.

(True/False)
4.8/5
(29)

System documentation is designed for all of the following groups except

(Multiple Choice)
4.9/5
(39)

Why is the payback method often more useful than the net present value method for evaluating systems projects?

(Short Answer)
4.8/5
(35)
Showing 21 - 40 of 94
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)