Why is cost-benefit analysis more difficult for information systems than for many other types of investments organizations make?

(Essay)
4.9/5
(45)

Which of the following is not a tool of systems analysts?

(Multiple Choice)
4.8/5
(37)

In the conceptual design phase of the Systems Development Life Cycle (SDLC), task force members are focused on selecting the new system design.

(True/False)
4.8/5
(34)

Which statement is not true?

(Multiple Choice)
4.9/5
(35)

Why is it important that the systems professionals who design a project not perform the detailed feasibility study of the project?

(Essay)
4.7/5
(42)

List four types of facts that should be gathered during an analysis of a system.

(Essay)
4.7/5
(39)

The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information system tend to be short and shorter payback projects are often desirable.

(True/False)
4.9/5
(46)

Outline the five controllable activities that relate to new systems development

(Essay)
4.8/5
(42)

Evaluators of the detailed feasibility study should not include

(Multiple Choice)
4.8/5
(38)

The systems analysis report does not

(Multiple Choice)
4.9/5
(40)

Recurring costs include: hardware maintenance, software acquisition, software maintenance, insurance, supplies and personnel costs.

(True/False)
4.8/5
(34)

When converting to a new system, which cutover method is the most conservative?

(Multiple Choice)
4.7/5
(36)

What is the purpose of the auditor's review of SDLC documentation?

(Essay)
4.9/5
(34)

Systems analysis involves all of the following except

(Multiple Choice)
4.8/5
(39)

Project feasibility includes all of the following except

(Multiple Choice)
4.9/5
(46)

Intangible benefits are not physical, but can be measured and expressed in financial terms.

(True/False)
4.9/5
(38)

Computer operators should have access to all of the following types of documentation except

(Multiple Choice)
4.8/5
(35)

When the nature of the project and the needs of the user permit, most organizations will seek a pre-coded commercial software package rather than develop a system in-house.

(True/False)
4.8/5
(36)

Which test of controls will provide evidence that the system as originally implemented was free from material errors and free from fraud? Review of the documentation indicates that

(Multiple Choice)
4.9/5
(33)

Examples of recurring costs include

(Multiple Choice)
4.9/5
(31)