Exam 5: Systems Development and Program Change Activities

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

When implementing a new system, the costs associated with transferring data from one storage medium to another is an example of

(Multiple Choice)
4.8/5
(35)

The formal product of the systems evaluation and selection phase of the Systems Development Life Cycle is

(Multiple Choice)
4.9/5
(37)

Which type of documentation shows the detailed relationship of input files, programs, and output files?

(Multiple Choice)
4.9/5
(41)

Source program library controls should prevent and detect unauthorized access to application programs.

(True/False)
4.8/5
(42)

Distinguish between escapable and inescapable costs. Give an example.

(Essay)
4.8/5
(35)

Routine maintenance activities require all of the following controls except

(Multiple Choice)
4.8/5
(44)

All of the steps in the Systems Development Life Cycle apply to software that is developed in-house and to commercial software.

(True/False)
4.7/5
(42)

____________________ benefits can be measured and expressed in financial terms, while ____________________ benefits cannot be easily measured and/or quantified.

(Short Answer)
4.9/5
(41)

Describe a risk associated with the phased cutover procedure for data conversion.

(Short Answer)
4.7/5
(29)

Which of the following is not an advantage of commercial software? Commercial software

(Multiple Choice)
4.8/5
(36)

When preparing a cost-benefit analysis, design costs incurred in the systems planning, systems analysis and conceptual design phases of the Systems Development Life Cycle are relevant costs.

(True/False)
4.7/5
(41)

One-time costs include operating and maintenance costs.

(True/False)
4.9/5
(40)

The objective of systems planning is to link systems projects to the strategic objectives of the firm.

(True/False)
5.0/5
(38)

Explain why accountants are interested in the legal feasibility of a new systems project.

(Essay)
4.9/5
(32)

When the auditor reconciles the program version numbers, which audit objective is being tested?

(Multiple Choice)
4.9/5
(43)

Program testing

(Multiple Choice)
4.9/5
(44)

The role of the accountant/internal auditor in the conceptual design phase of the Systems Development Life Cycle includes all of the following except

(Multiple Choice)
4.8/5
(42)

What are program version numbers and how are the used?

(Essay)
4.8/5
(44)

The testing of individual program modules is a part of

(Multiple Choice)
4.9/5
(39)

Discuss the three groups that participate in systems development.

(Essay)
4.9/5
(39)
Showing 61 - 80 of 94
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)