Bug status is set to postpone due to _.

Free
(Multiple Choice)
4.8/5
(27)
Correct Answer:
Verified

D

A chronological record of relevant details about the execution of tests is called as, a _______

Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
Verified

D

Which of the following is not other name for structural testing?

Free
(Multiple Choice)
4.8/5
(30)
Correct Answer:
Verified

C

The expected results of the software is _.

(Multiple Choice)
4.8/5
(37)

Which things are measured by software Test effectiveness?

(Multiple Choice)
4.9/5
(29)

End result of Software Requirement Analysis is _.

(Multiple Choice)
4.8/5
(40)

Which Testing is performed ?rst?

(Multiple Choice)
5.0/5
(39)

Test cases are created in which phase?

(Multiple Choice)
4.8/5
(31)

In which of the following type of testing, testing is done without planning and documentation?

(Multiple Choice)
4.8/5
(25)

Non functional testing is performed only at system testing level. True or false.

(True/False)
4.8/5
(40)

7n test cases are generated in which case of Boundary Value Analysis?

(Multiple Choice)
4.8/5
(34)

Test wares are handed over to maintenance team during which phase?

(Multiple Choice)
4.8/5
(37)

Requirement Engineering is not concern with _.

(Multiple Choice)
4.8/5
(29)

Who leads a formal review process?

(Multiple Choice)
4.7/5
(32)

When an expected result is not speci?ed in test case template then _.

(Multiple Choice)
4.8/5
(33)

When should company stop the testing of a particular software?

(Multiple Choice)
4.8/5
(43)

Veri?cation and Validation uses _.

(Multiple Choice)
4.9/5
(32)

Before handing over the software to the client, which testing is to be done in-house?

(Multiple Choice)
4.7/5
(37)

Which testing cannot be performed on ?rst build of the software?

(Multiple Choice)
4.9/5
(31)

___________ refers to a different set of tasks ensures that the software that has been built is traceable to Customer Requirements.