Exam 10: Systems Implementation and Operation
Exam 1: The Systems Development Environment116 Questions
Exam 2: The Sources of Software107 Questions
Exam 3: Managing the Information Systems Project133 Questions
Exam 4: Systems Planning and Selection134 Questions
Exam 5: Determining System Requirements136 Questions
Exam 6: Structuring System Requirements: Process Modeling149 Questions
Exam 7: Structuring System Requirements: Conceptual Data Modeling180 Questions
Exam 8: Designing the Human Interface133 Questions
Exam 9: Designing Databases157 Questions
Exam 10: Systems Implementation and Operation151 Questions
Exam 11: object-Oriented Analysis and Design131 Questions
Exam 12: Agile Methodologies127 Questions
Select questions type
Which of the following maintenance cost elements is the most significant?
(Multiple Choice)
4.8/5
(37)
Match each of the following types of testing with its corresponding definition.
-User testing of a completed information system using real data in the real user environment
(Multiple Choice)
4.8/5
(41)
The systems analysis phase of the SDLC is analogous to the maintenance process of obtaining maintenance requests.
(True/False)
4.9/5
(34)
The process whereby actual users test a completed information system, the end result of which is the users' acceptance of it, best defines:
(Multiple Choice)
5.0/5
(37)
The person responsible for controlling the checking out and checking in of baseline modules for a system that is being developed or maintained is the:
(Multiple Choice)
4.8/5
(33)
Match each of the following types of testing with its corresponding definition.
-User testing of a completed information system using simulated data
(Multiple Choice)
4.9/5
(24)
All of the following are types of user documentation EXCEPT:
(Multiple Choice)
4.8/5
(37)
Training and support are not critical for the success of an information system.
(True/False)
4.9/5
(34)
Match each of the following types of testing with its corresponding definition.
-The process whereby actual users test a completed information system, the end result of which is the users' acceptance of it
(Multiple Choice)
4.8/5
(33)
Match each of the following terms with its corresponding definition.
-The process of assuring that only authorized changes are made to a system
(Multiple Choice)
4.8/5
(27)
The people who create the test cases should be the same people who have coded and will test the system.
(True/False)
4.9/5
(35)
A risk associated with the parallel installation approach is that there may be a delay until benefits result.
(True/False)
4.8/5
(26)
Software modules that have been tested, documented, and approved to be included in the most recently created version of a system best describes:
(Multiple Choice)
4.9/5
(42)
Unit testing is a technique used in testing modules, especially where modules are written and tested in a top-down fashion, where a few lines of code are used to substitute for subordinate modules.
(True/False)
4.7/5
(39)
A positive aspect of the phased installation approach is that it limits potential harm and costs from system error or failure to certain business activities or functions.
(True/False)
4.8/5
(33)
The systems planning and selection phase of the SDLC is analogous to the maintenance process of transforming requests into a specific system change.
(True/False)
4.9/5
(34)
Match each of the following terms with its corresponding description.
-Changing over from the old information system to a new one incrementally, starting with one or a few functional components and then gradually extending the installation to cover the whole new system
(Multiple Choice)
5.0/5
(35)
Showing 21 - 40 of 151
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)