Exam 10: Systems Implementation and Operation
Exam 1: The Systems Development Environment116 Questions
Exam 2: The Sources of Software107 Questions
Exam 3: Managing the Information Systems Project133 Questions
Exam 4: Systems Planning and Selection134 Questions
Exam 5: Determining System Requirements136 Questions
Exam 6: Structuring System Requirements: Process Modeling149 Questions
Exam 7: Structuring System Requirements: Conceptual Data Modeling180 Questions
Exam 8: Designing the Human Interface133 Questions
Exam 9: Designing Databases157 Questions
Exam 10: Systems Implementation and Operation151 Questions
Exam 11: object-Oriented Analysis and Design131 Questions
Exam 12: Agile Methodologies127 Questions
Select questions type
System documentation that includes the outcome of such structured diagramming techniques as data-flow and entity-relationship diagrams best defines:
(Multiple Choice)
4.8/5
(32)
Match each of the following types of user documentation with its corresponding description.
-This type of documentation allows users to test for proper system installation and then signify their approval of the new system with their signatures.
(Multiple Choice)
4.8/5
(32)
Match each of the following terms with its corresponding definition.
-A technique used in testing modules, especially where modules are written and tested in a top-down fashion, where a few lines of code are used to substitute for subordinate modules
(Multiple Choice)
4.9/5
(38)
Which of the following is the responsibility of testing managers?
(Multiple Choice)
4.8/5
(30)
Documentation is one of the seven major activities associated with systems implementation and operation.
(True/False)
4.7/5
(39)
Many organizations are deploying Web-based ticketing systems to provide a way to track support requests.
(True/False)
4.8/5
(29)
A testing technique in which the program code is sequentially executed manually by the reviewer is referred to as:
(Multiple Choice)
4.9/5
(30)
Match each of the following terms with its corresponding description.
-Changing over from the old information system to a new one by turning off the old system as the new one is turned on
(Multiple Choice)
4.9/5
(30)
Match each of the following types of testing with its corresponding definition.
-This type of test forces the software (or environment) to fail in order to verify that recovery is properly performed.
(Multiple Choice)
4.7/5
(43)
Match each of the following terms with its corresponding definition.
-The organizational process of changing over from the current information system to a new one
(Multiple Choice)
4.8/5
(42)
A positive aspect of the phased installation approach is that learning can occur and problems can be fixed by concentrating on one site.
(True/False)
4.8/5
(43)
Installation is the organizational process of changing over from the current information system to a new one.
(True/False)
4.8/5
(29)
Match each of the following terms with its corresponding definition.
-Trying out a new information system at one site and using the experience to decide if and how the new system should be deployed throughout the organization
(Multiple Choice)
4.9/5
(44)
Match each of the following terms with its corresponding definition.
-A measurement of error occurrences that can be tracked over time to indicate the quality of a system
(Multiple Choice)
4.8/5
(36)
This type of user documentation is intended primarily for those who will install and administer a new system and contains information about the network on which the system will run, software interfaces for peripherals such as printers, troubleshooting, and setting up user accounts.
(Multiple Choice)
4.8/5
(42)
The process of bringing together all of the modules that comprise a program for testing purposes is referred to as:
(Multiple Choice)
4.9/5
(31)
Testing each module alone in an attempt to discover any errors that may exist in the module's code is referred to as:
(Multiple Choice)
4.9/5
(33)
Match each of the following terms with its corresponding definition.
-Running the old information system and the new one at the same time until management decides the old system can be turned off
(Multiple Choice)
4.7/5
(38)
Showing 121 - 140 of 151
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)