How much slack time do activities on the critical path of a project have?

(Multiple Choice)
4.9/5
(37)

What type of information technology professional specializes in analyzing and designing products and services for business?

(Multiple Choice)
4.9/5
(30)

A problem with the traditional systems development life cycle is that formal end-of-phase reviews do not occur; thus, it is very difficult to contain the scope of the project, and the project never seems to end.

(True/False)
4.7/5
(45)

Continuous improvement projects do not require a lot of changes or retraining of people; thus, they have a higher degree of success than reengineering projects.

(True/False)
4.9/5
(40)

Larkin has been assigned to the Skating Project.She needs to have a panoramic view of the project and will work closely with different groups.What is her role?

(Multiple Choice)
4.9/5
(32)

The ____________________ is the date the entire project is to be complete and operational.

(Short Answer)
4.9/5
(39)

Experienced systems developers prefer a systems development approach that will catch errors ____________________ in the project life cycle.

(Short Answer)
4.8/5
(36)

Why are more organizations outsourcing system development?

(Multiple Choice)
4.7/5
(36)

In general, smaller projects have a higher probability of success than larger projects.

(True/False)
4.9/5
(48)

How can an organization effectively reduce risk and protect its critical data resources?

(Multiple Choice)
4.8/5
(39)

What is the primary outcome of the systems analysis phase?

(Multiple Choice)
4.8/5
(38)

Which of the following statements is applicable to the systems steering committee?

(Multiple Choice)
4.8/5
(39)

____________________ allows an information system to handle business growth and increased business volume.

(Short Answer)
4.8/5
(34)

The extent to which a system performs as desired can be measured through its ____________________ objectives.

(Short Answer)
4.8/5
(37)

Which of the following is a characteristic of data-flow diagrams?

(Multiple Choice)
4.8/5
(43)

____________________ uses pairs of programmers who work together to design, test, and code parts of the system they develop.

(Short Answer)
4.9/5
(44)

System users and system stakeholders are essentially the same set of people.

(True/False)
4.8/5
(29)

What is the second level in the capability maturity model?

(Multiple Choice)
4.8/5
(39)

____________________ determines whether the project makes financial sense and whether predicted benefits offset the cost and time needed to obtain them.

(Short Answer)
4.7/5
(38)

Identify and briefly describe the various types of project feasibility that must be evaluated.

(Essay)
4.8/5
(27)
Showing 61 - 80 of 95