Exam 4: Linear Programming Models
Exam 1: Introduction to Modeling30 Questions
Exam 2: Introduction to Spreadsheet Modeling30 Questions
Exam 3: Introduction to Optimization Modeling30 Questions
Exam 4: Linear Programming Models31 Questions
Exam 5: Network Models30 Questions
Exam 6: Optimization Models With Integer Variables30 Questions
Exam 7: Nonlinear Optimization Models30 Questions
Exam 8: Evolutionary Solver: An Alternative Optimization Procedure30 Questions
Exam 9: Decision Making Under Uncertainty30 Questions
Exam 10: Introduction to Simulation Modeling30 Questions
Exam 11: Simulation Models30 Questions
Exam 12: Queueing Models30 Questions
Exam 13: Regression and Forecasting Models30 Questions
Exam 14: Data Mining30 Questions
Select questions type
One way to solve a dual-objective problem is to use one objective as the target cell and constrain the other.
Free
(True/False)
4.9/5
(44)
Correct Answer:
True
Workforce scheduling problems in which the worker schedules continue week to week are:
Free
(Multiple Choice)
4.9/5
(40)
Correct Answer:
D
Exhibit 4-3
A meat market manager for a large grocery store is preparing a processing plan to stock the shelves with sausage, ground meat, and jerky, which he can prepare from beef, pork and venison. Sausage and ground meat can be made of any mix of the beef, pork and venison, as long at the fat contents are below 15% for sausage and 10% for ground meat. Sausage sells for $5/pound and ground meat sells for $3/pound. Jerky, which sells or $10/pound, is made in a drying process from beef or venison. In the drying process, there is a 50% loss in weight for jerky made from beef (e.g., one pound of beef yields 0.5 pounds of beef jerky) and a 20% loss in weight for jerky made from venison. The market can sell at most 500 pounds of sausage, 1000 pounds of ground meat, and 100 pounds of jerky before their expiration dates. There are currently 1,000 pounds of beef (10% fat content), 500 pounds of pork (8% fat content), and 200 pounds of venison (2% fat content) available for processing.
-[Part 1] Refer to Exhibit 4-3.Suppose that later in the year,venison will be out of season,but the market will be able to obtain an additional 300 pounds of pork for the same costs.Develop a processing plan in that case.How does the solution change
Free
(Essay)
4.9/5
(22)
Correct Answer:
The maximum amounts of each product can still be made.The jerky will be made from beef,instead of venison,and the additional pork will be used in making ground meat,since less beef will be available for that purpose.
In blending problems,if a quality constraint involves a quotient,then the problem will be nonlinear.
(True/False)
4.9/5
(35)
Aggregate planning models usually relate a beginning value in one period to an ending value from the previous period.
(True/False)
4.8/5
(32)
In aggregate planning models,we can model backlogging of demand by allowing a month's inventory to be negative.
(True/False)
4.9/5
(28)
Exhibit 4-2
A construction company is preparing for a nine-month project, and will need to develop a staffing plan. The company can assign up to 30 of its own full-time employees to the project, and will hire short-term contract employees to make up any shortage in meeting the personnel requirements. Company employees earn $6,000 per month, while short-term contract employees make $8,600/month. Contract employees can be assigned to the project beginning in any month, and their contract period is two months. The number of workers required for the project by month is shown below:
-Refer to Exhibit 4-2.The project manager is evaluating options to complete the project early so that the company can earn a bonus.He has determined that the project schedule can be compressed into a six-month schedule,with the same total number of worker-months.In that case,the staffing requirements are as shown below.Develop an optimal staffing plan for the project under the accelerated schedule. Month of Project
1 2 3 4 5 6 Required 26 38 84 105 101 84

(Essay)
4.9/5
(29)
Exhibit 4-4
A company blends nitrogen and phosphorous to produce two types of fertilizers. Fertilizer 1 must be at least 50% nitrogen and sells for $55 per pound. Fertilizer 2 must be at least 55% phosphorous and sells for $45 per pound. The company can purchase up to 9000 pounds of nitrogen at $20 per pound and up to 12,000 pounds of phosphorous at $12 per pound.
-Refer to Exhibit 4-4.Assuming that all fertilizer produced can be sold,determine the optimal blending plan for the company.What is the maximum profit
(Essay)
4.8/5
(31)
Exhibit 4-2
A construction company is preparing for a nine-month project, and will need to develop a staffing plan. The company can assign up to 30 of its own full-time employees to the project, and will hire short-term contract employees to make up any shortage in meeting the personnel requirements. Company employees earn $6,000 per month, while short-term contract employees make $8,600/month. Contract employees can be assigned to the project beginning in any month, and their contract period is two months. The number of workers required for the project by month is shown below:
-Refer to Exhibit 4-2.Suppose the bonus for completing the project three months early is $250,000.What would be the net bonus to the company,after adjusting for any difference in personnel costs under the accelerated schedule

(Essay)
4.9/5
(40)
Exhibit 4-1
A hospital emergency room requires different numbers of nurses on different days of the week. The number of full-time employees required to be working (i.e. not on call) each day is given in the table below.
Mon Tue Wed Thu Fri Sat Sun 18 15 12 13 20 28 22 Hospital rules require that nurses work four consecutive days, are on call for one day, and then receive two days off. The hospital wants to meet its daily requirements, while minimizing the number of nurses that must be on staff.
-Refer to Exhibit 4-1.Suppose the hospital has 40 nurses and is not allowed to hire or fire any employees,and cannot temporarily schedule nurses on their on call days.Determine a schedule that maximizes the number of weekend days off received by the nurses.
(Essay)
4.8/5
(43)
If integer constraints are used in a model,Solver uses an algorithm called branch and round to obtain the solution.
(True/False)
4.8/5
(32)
To specify that X1 must be at most 75% of the blend of X1,X2,and X3,we must have a constraint of the form
(Multiple Choice)
4.7/5
(37)
Exhibit 4-2
A construction company is preparing for a nine-month project, and will need to develop a staffing plan. The company can assign up to 30 of its own full-time employees to the project, and will hire short-term contract employees to make up any shortage in meeting the personnel requirements. Company employees earn $6,000 per month, while short-term contract employees make $8,600/month. Contract employees can be assigned to the project beginning in any month, and their contract period is two months. The number of workers required for the project by month is shown below:
-Refer to Exhibit 4-2.Determine the optimal staffing plan for the project.

(Essay)
4.9/5
(39)
Exhibit 4-4
A company blends nitrogen and phosphorous to produce two types of fertilizers. Fertilizer 1 must be at least 50% nitrogen and sells for $55 per pound. Fertilizer 2 must be at least 55% phosphorous and sells for $45 per pound. The company can purchase up to 9000 pounds of nitrogen at $20 per pound and up to 12,000 pounds of phosphorous at $12 per pound.
-Refer to Exhibit 4-4.Suppose the company could acquire 1,000 pounds more of either nitrogen or phosphorous.Which should it choose
What would be the resulting impact on profit
(Essay)
4.9/5
(35)
In aggregate planning models,the number of workers available influences the possible production levels.
(True/False)
4.7/5
(25)
If we round the optimal values in the changing cells of a linear programming model,this is a good approximation of the integer programming solution.
(True/False)
4.8/5
(37)
Exhibit 4-3
A meat market manager for a large grocery store is preparing a processing plan to stock the shelves with sausage, ground meat, and jerky, which he can prepare from beef, pork and venison. Sausage and ground meat can be made of any mix of the beef, pork and venison, as long at the fat contents are below 15% for sausage and 10% for ground meat. Sausage sells for $5/pound and ground meat sells for $3/pound. Jerky, which sells or $10/pound, is made in a drying process from beef or venison. In the drying process, there is a 50% loss in weight for jerky made from beef (e.g., one pound of beef yields 0.5 pounds of beef jerky) and a 20% loss in weight for jerky made from venison. The market can sell at most 500 pounds of sausage, 1000 pounds of ground meat, and 100 pounds of jerky before their expiration dates. There are currently 1,000 pounds of beef (10% fat content), 500 pounds of pork (8% fat content), and 200 pounds of venison (2% fat content) available for processing.
-Refer to Exhibit 4-3.Determine the optimal processing plan for the meat market.
(Essay)
4.8/5
(34)
When a workforce scheduling problem is formulated as an integer programming model,it has:
(Multiple Choice)
4.8/5
(37)
Integer programming (IP)models are optimization models in which all of the variables must be integers.
(True/False)
4.9/5
(31)
Multiple optimal solutions are quite common in linear programming models.
(True/False)
4.9/5
(36)