Exam 5: Project Scope Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A(n) _____ is a document that describes detailed information about each WBS item.

(Short Answer)
4.9/5
(38)

List and briefly describe five approaches for creating work breakdown structures.

(Essay)
4.9/5
(42)

The term ______ describes a product produced as part of a project.

(Multiple Choice)
4.8/5
(38)

The tasks in a WBS must be developed as a sequential list of steps.

(True/False)
5.0/5
(36)

Project scope statements must include the project boundaries, constraints, and assumptions.

(True/False)
4.9/5
(41)

_____ is a technique that uses branches radiating out from a core idea to structure thoughts and ideas when creating a WBS.

(Short Answer)
4.8/5
(40)

Subdividing the project deliverables into smaller pieces is known as _____.

(Short Answer)
4.9/5
(45)

What is a work breakdown structure? What are the inputs and tools used for creating one?

(Essay)
4.9/5
(34)

PMI uses the term "_____" to describe each level of work in the WBS.

(Short Answer)
4.9/5
(34)

A(n) _____ is a table that lists requirements, their various attributes, and the status of the requirements to ensure that all are addressed.

(Essay)
4.7/5
(42)

The project's size, complexity, importance, and other factors do not affect how much effort is spent on collecting requirements for scope planning.

(True/False)
5.0/5
(45)

The project scope statement should reference supporting documents, such as product specifications that will affect what products are produced or purchased, or corporate policies, which might affect how products or services are produced.

(True/False)
4.8/5
(38)

The format of the WBS dictionary is essentially the same for all projects.

(True/False)
4.9/5
(33)

List and briefly describe the six main processes involved in project scope management.

(Essay)
4.9/5
(34)

Creating the _____ involves subdividing the major project deliverables into smaller, more manageable components.

(Essay)
4.8/5
(42)

_____ involves developing a working replica of the system or some aspect of the system.

(Short Answer)
4.9/5
(37)

Given the project management software that is available, it is relatively easy to create a good WBS.

(True/False)
5.0/5
(35)

The _____ technique for creating a WBS uses branches radiating from a core idea to structure thoughts and ideas instead of writing down tasks in a list or immediately trying to create a structure for tasks.

(Multiple Choice)
4.8/5
(30)

Scope refers to:

(Multiple Choice)
4.9/5
(41)

Mind mapping allows people to write and even draw pictures of ideas in a nonlinear format.

(True/False)
4.8/5
(39)
Showing 41 - 60 of 77