Information system design projects are not susceptible to scope creep because of the rigorous SDLC methodology.

(True/False)
4.9/5
(25)

In a __________ conversion,the old system and the new system operate simultaneously for a period of time,which is the most expensive,but also the least risky approach.

(Short Answer)
4.8/5
(36)

Enterprises face the challenge of deciding which investments to make and how to allocate scarce resources to competing projects.Typically a senior manager composes a(n)________ that outlines the justification for the start-up and funding of a project.

(Multiple Choice)
4.7/5
(35)

The __________ is the traditional systems development method used by organizations for large IT projects such as IT infrastructure.

(Multiple Choice)
4.8/5
(34)

Closing out a project benefits the _________.

(Multiple Choice)
4.8/5
(29)

During the system investigation stage,__________ studies are done to determine if the hardware,software,and communications components can be developed and/or acquired to solve the business problem.

(Multiple Choice)
4.8/5
(37)

________ are multipurpose visualization tools that show the timeline of the project schedule;and are used for planning,scheduling,and at-a-glance status reports.

(Multiple Choice)
4.9/5
(29)

Identify and explain two types of feasibility testing.

(Essay)
4.9/5
(36)

Covert resistance to a new IS from employees may take the form of __________.

(Multiple Choice)
4.9/5
(29)

Identify and describe the triple constraint of project management.Why is it important to manage the triple constraint?

(Essay)
4.9/5
(28)

The ________ identifies all work or activities that need to be performed,the schedule of work,and who will perform the work.

(Multiple Choice)
4.9/5
(34)

Which of the following is not a red flag that indicates IT project problems?

(Multiple Choice)
4.8/5
(35)

Technical feasibility addresses two primary questions: Do the benefits outweigh the costs of the project? Can the project be completed as scheduled?

(True/False)
4.7/5
(39)

Integrated change control processes are always documented and saved in the event of project failure or lawsuits related to the failure.

(True/False)
4.9/5
(36)

Management can assess economic feasibility by using cost-benefit analysis,ROI,NPV,and breakeven analysis.

(True/False)
4.7/5
(31)

A project is a well-planned sequential series of tasks to achieve a result;and have a defined beginning and end,a scope,resources,and a budget.

(True/False)
4.7/5
(37)

________ is the longest path of tasks through a project and a delay of any of these tasks will delay the project if corrective action is not taken.

(Short Answer)
4.7/5
(33)

__________ is the growth of the project after the scope has been defined and is a serious issue because it can cause the project to fail.

(Short Answer)
4.8/5
(40)

During project analysis,IT projects should be examined holistically-that is,in combination in order to identify investment synergies-using a project portfolio management approach.

(True/False)
4.8/5
(40)

Requirements analysis is critical to the success of the project.

(True/False)
4.8/5
(41)