Exam 7: Quality, Performance and Value
Exam 1: Projects and Project Management80 Questions
Exam 2: Process and Methods80 Questions
Exam 3: Project Management Tools80 Questions
Exam 4: Project Initiation80 Questions
Exam 5: Project Planning80 Questions
Exam 6: Risk Management80 Questions
Exam 7: Quality, Performance and Value80 Questions
Exam 8: Project Scheduling80 Questions
Exam 9: Resources, Costing, and Control80 Questions
Exam 10: Project Closure80 Questions
Exam 11: Project Organizational Structures80 Questions
Exam 12: Project Success80 Questions
Select questions type
A review of the quality plan to determine whether the project activities comply with organizational and project policies,processes,and procedures defines
(Multiple Choice)
4.9/5
(43)
A process control chart used to monitor the sample means of variables that result from a process and is often used in quality control best defines
(Multiple Choice)
4.8/5
(37)
ISO 10006:2003 emphasizes quality assurance via preventive actions instead of just checking the final product,system or service.
(True/False)
4.9/5
(36)
A process to measure the performance of an organization and compare that measure with other organizations in the same industry to understand industry best practices defines
(Multiple Choice)
4.9/5
(29)
The extent to which a product can be easily repaired and serviced best defines
(Multiple Choice)
4.9/5
(33)
The range in which the true value of the population is estimated best defines level of
(Multiple Choice)
4.9/5
(35)
Quality planning is more about process and is based on problems related to processes.
(True/False)
4.9/5
(37)
According to the textbook,scholars have viewed cost,time,and quality as the success criteria to project performance.
(True/False)
4.8/5
(41)
Simple random sampling stratifies the population by important variables.
(True/False)
4.8/5
(37)
Overall benchmarking can be broken into two major processes: the external review process and the internal review process.
(True/False)
4.9/5
(46)
The superiority or excellence of primary operating characteristics of a product best describes
(Multiple Choice)
4.9/5
(44)
A project organization must apply quality standards and quality management at the organizational,process,and project levels.
(True/False)
4.9/5
(45)
Which of the following is the sampling selection method where every member of the population is given an equal chance?
(Multiple Choice)
4.7/5
(36)
Which of the following types of reviews is conducted to evaluate the status of a project in order to understand and allocate resources?
(Multiple Choice)
4.9/5
(35)
A configuration review is a formal procedure for reviewing a product,system,or service against quality criteria set forth by the project organization.
(True/False)
4.8/5
(38)
Showing 61 - 80 of 80
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)