Exam 9: Systems Development and Project Management: Corporateresponsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which high-level programming language uses C+ and Java?

(Multiple Choice)
4.9/5
(34)

Which methodology provides a framework for breaking down the development of software into four gates?

(Multiple Choice)
4.8/5
(32)

What consists of a series of tiny projects?

(Multiple Choice)
4.8/5
(34)

A service is the capability of services to be joined together on demand to create composite services, or disassembled just as easily into their functional component.

(True/False)
4.9/5
(43)

Process modeling involves graphically representing the processes that capture, manipulate, store, and distribute information between a system and its environment.

(True/False)
4.8/5
(42)

Fourth-generation languages (4GL) are programming languages that look similar to human languages.For example, a typical 4GL command might state, "FIND ALL RECORDS WHERE NAME IS 'SMITH'."

(True/False)
4.8/5
(45)

Offshore outsourcing uses organizations from developing countries to write code and develop systems.

(True/False)
4.7/5
(30)

Exception reports organize and categorize data for managerial perusal.

(True/False)
4.8/5
(43)

What determines if the system satisfies the user and business requirements?

(Multiple Choice)
4.9/5
(31)

Interoperability is the capability of two or more computer systems to share data and resources, even though they are made by different manufacturers.

(True/False)
4.8/5
(29)

What is a session in which employees meet, sometimes for several days, to define or review the business requirements for the system?

(Multiple Choice)
4.7/5
(41)

Which phase brings all the project pieces together into a special testing environment to eliminate errors and bugs and verify that the system meets all the business requirements defined in the analysis phase?

(Multiple Choice)
4.8/5
(30)

Unit testing uses both the legacy system and new system until all users verify that the new system functions correctly.

(True/False)
4.9/5
(31)

What is technical feasibility?

(Multiple Choice)
4.8/5
(37)

How many days is a typical sprint in the Scrum methodology?

(Multiple Choice)
4.9/5
(42)

What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

(Multiple Choice)
4.8/5
(32)

User acceptance testing (UAT) determines if the system satisfies the user and business requirements.

(True/False)
4.9/5
(45)

Gate one includes inception, and this phase ensures that all stakeholders have a shared understanding of the proposed system and what it will do.

(True/False)
4.8/5
(35)

Software engineering is a disciplined approach for constructing information systems through the use of common methods, techniques, or tools.

(True/False)
4.7/5
(28)

What is political feasibility?

(Multiple Choice)
4.7/5
(36)
Showing 101 - 120 of 311