Exam 3: Process Choice and Layout Decisions in Manufacturing and Services
Exam 1: Introduction to Operations and Supply Chain Management67 Questions
Exam 2: Operations and Supply Chain Strategies71 Questions
Exam 3: Process Choice and Layout Decisions in Manufacturing and Services82 Questions
Exam 4: Business Processes71 Questions
Exam 5: Managing Quality58 Questions
Exam 6: Managing Capacity61 Questions
Exam 6: A: Advanced Waiting Line Theory and Simulation Modeling63 Questions
Exam 7: Supply Management82 Questions
Exam 8: Logistics78 Questions
Exam 9: Forecasting69 Questions
Exam 10: Sales and Operations Planning Aggregate Planning68 Questions
Exam 11: Managing Inventory Throughout the Supply Chain69 Questions
Exam 12: Managing Production Across the Supply Chain82 Questions
Exam 12: A: Supply Chain Information Systems54 Questions
Exam 13: Jitlean Production64 Questions
Exam 14: Managing Projects72 Questions
Exam 15: Developing Products and Services75 Questions
Select questions type
Use this scenario for the following questions.
The process design team at a manufacturer has broken an assembly process into eight basic steps, each with a required time, and predecessor as shown in the table. There are 7.5 productive hours available in a day and the manufacturer wishes to produce 400 units. Balance the line by assigning tasks to workstations to fill up as much takt time as possible. Break ties by assigning the longest task first.
-Refer to the scenario above.The process design team realizes that the potential spike in demand for this device requires increased output.They elect to add a seventh worker to their production team at the first station.What is the net effect of adding this worker?

(Multiple Choice)
4.9/5
(33)
The manufacturing process used to make a wide variety of highly customized products in quantities as small as one is a:
(Multiple Choice)
4.9/5
(28)
In a service blueprint,the two layers the customer is involved with are the ________ and the ________.
(Short Answer)
4.8/5
(32)
In a service blueprint,the line of internal interaction falls between the customer and the onstage service provider.
(True/False)
4.8/5
(31)
The maximum allowable time between completions of successive units on the production line is the ________.
(Short Answer)
4.7/5
(36)
The time between completions of successive units on a production line is called:
(Multiple Choice)
4.8/5
(38)
The Devon Tower graces the Oklahoma City skyline and is officially the tallest building in the state.The manufacturing process used to produce this jewel is most probably:
(Multiple Choice)
4.9/5
(35)
A collection of different departments must be visited by every new student on campus to take care of registration,housing,books,and other campus services.The placement of these departments within the university center is an example of a(n)________ layout.
(Short Answer)
4.9/5
(40)
________ gets its name from the fact that items are moved through the different manufacturing steps in groups.
(Short Answer)
4.8/5
(34)
A(n)________ is a highly automated batch process that can reduce the cost of making groups of similar products.
(Short Answer)
4.9/5
(33)
A batch process is less flexible than a production line and less efficient that a job shop.
(True/False)
4.8/5
(37)
The shorter the required takt time,the more workstations will be required to balance a production line.
(True/False)
4.8/5
(30)
As the degree of customer contact decreases,more of the service package is provided by the ________.
(Short Answer)
4.8/5
(32)
A manufacturer needs to produce 300 coffee pots per 8 hour day.The discrete tasks required to produce a coffee pot have been identified,timed in seconds,and ordered as indicated in the table.Sketch the precedence diagram and then assign tasks to workstations on the production line to achieve the required level of output.Break ties by assigning the longest task first.Determine the efficiency delay of your line balance.


(Essay)
4.9/5
(43)
Products that use standard components,but the final configuration of those components is customer-specific,are called make-to-order products.
(True/False)
4.9/5
(41)
A manager deciding where six departments could be located in a six-room office building has over 500 possible arrangements.
(True/False)
4.9/5
(37)
According to the law of variability,the ________ the random variability either demanded of the process or inherent in the process itself or in the items processed,the ________ productive the process is.
(Short Answer)
4.8/5
(21)
Showing 41 - 60 of 82
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)