Exam 4: Activity-Based Costing, Lean Operations, and the Costs of Quality

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is one of the four cost categories typically found on a cost of quality report?

(Multiple Choice)
4.9/5
(34)

Waste activities is another name for non-value-added activities.

(True/False)
4.9/5
(30)

Managers who practice total quality management

(Multiple Choice)
4.9/5
(34)

All of the following describe an ABC system except

(Multiple Choice)
4.9/5
(44)

The cost to rework a defective product before it is shipped out from the factory would be classified as which cost of quality category?

(Multiple Choice)
4.8/5
(38)

Which of the following is not a factor in the success of a lean company?

(Multiple Choice)
4.8/5
(35)

Non-value-added activities can be described as activities for which the customer is willing to pay.

(True/False)
4.8/5
(41)

The use of which of the following costing systems is most likely to reduce cost distortion to a minimum?

(Multiple Choice)
4.8/5
(36)

Lean thinking is a management philosophy that strives to create value by eliminating waste.

(True/False)
4.8/5
(30)

Using traditional costing instead of ABC costing might lead to all of the following except

(Multiple Choice)
4.8/5
(32)

When calculating the total amount of manufacturing overhead to allocate to a particular job, the company would multiply each departmental overhead rate by ________ and then ________ together the allocated amounts from each department.

(Multiple Choice)
4.9/5
(37)

In using an ABC system, all of the following steps are performed before the company's year begins except

(Multiple Choice)
4.8/5
(31)

The cost of searching for a supplier of higher quality raw materials (than the current supplier)would be classified as which cost of quality category?

(Multiple Choice)
4.8/5
(38)

Benjamin Company manufactures a wide variety of products and uses an activity-based costing system. Data from its activity-based costing system for all products follows: Benjamin Company manufactures a wide variety of products and uses an activity-based costing system. Data from its activity-based costing system for all products follows:   What is the engineering cost pool rate per engineering hour? What is the engineering cost pool rate per engineering hour?

(Multiple Choice)
4.7/5
(38)

The goal of total quality management (TQM)is to provide customers with inferior products and services.

(True/False)
4.9/5
(38)

Direct labor hours would be the most appropriate cost allocation base for a Machining Department that uses machine robotics extensively.

(True/False)
4.8/5
(32)

Potter & Weasley Company had the following activities, estimated indirect activity costs, and allocation bases: Potter & Weasley Company had the following activities, estimated indirect activity costs, and allocation bases:   Potter & Weasley uses activity based costing. The above activities are used by Departments P and Q as follows:   How much of the account verification costs will be assigned to Department P? Potter & Weasley uses activity based costing. The above activities are used by Departments P and Q as follows: Potter & Weasley Company had the following activities, estimated indirect activity costs, and allocation bases:   Potter & Weasley uses activity based costing. The above activities are used by Departments P and Q as follows:   How much of the account verification costs will be assigned to Department P? How much of the account verification costs will be assigned to Department P?

(Multiple Choice)
4.8/5
(40)

Which of the following systems focuses on activities as the fundamental cost objects and uses the costs of those activities as building blocks for compiling the indirect costs of products and other cost objects?

(Multiple Choice)
4.9/5
(36)

Which of the following is true about lean thinking?

(Multiple Choice)
4.8/5
(30)

In ABC, how is the activity allocation rate computed?

(Multiple Choice)
4.8/5
(50)