Which of the following is an outsourcing challenge caused by contract length?

(Multiple Choice)
4.9/5
(30)

What is the systems development life cycle (SDLC)?

(Multiple Choice)
4.7/5
(41)

What are project constraints?

(Multiple Choice)
4.8/5
(40)

The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.

(True/False)
4.9/5
(34)

What are the three primary variables (or triple constraints) in any project?

(Multiple Choice)
4.9/5
(35)

The prototype is an essential part of the analysis phase when using which methodology?

(Multiple Choice)
4.9/5
(38)

What is a business requirement?

(Multiple Choice)
4.7/5
(40)

What development style consists of a series of tiny projects?

(Multiple Choice)
4.9/5
(34)

Which of the following is a benefit an organisation can receive from outsourcing?

(Multiple Choice)
4.8/5
(35)

Project milestones are any measurable,tangible,verifiable outcome,result or item that is produced to complete a project or part of a project.

(True/False)
4.9/5
(38)

What is the application of knowledge,skills,tools and techniques to project activities to meet project requirements?

(Multiple Choice)
4.9/5
(41)

A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.

(True/False)
4.8/5
(33)

The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

(True/False)
4.8/5
(40)

All of the following are challenges of outsourcing,except:

(Multiple Choice)
4.7/5
(40)

Preventing liabilities is a business-related consequence of failed software.

(True/False)
4.9/5
(37)

An organisation must identify what it wants to do and how it is going to do it.What does the 'how' part of this question focus on?

(Multiple Choice)
4.8/5
(27)

Which methodology ends or begins each day with a stand-up meeting to monitor and control the development effort?

(Multiple Choice)
4.9/5
(40)

Which of the following does a project manager perform?

(Multiple Choice)
4.9/5
(40)

Explain project management and the role the triple constraints play when managing a project.

(Essay)
4.7/5
(28)

Describe the seven phases of the systems development life cycle.

(Essay)
4.9/5
(39)