Exam 23: Theory of Constraints
Exam 1: Introduction84 Questions
Exam 2: Strategy54 Questions
Exam 3: Design of Products and Services58 Questions
Exam 4: Project Management78 Questions
Exam 5: Strategic Capacity Management64 Questions
Exam 6: Learning Curves60 Questions
Exam 7: Manufacturing Processes44 Questions
Exam 8: Facility Layout58 Questions
Exam 9: Service Processes67 Questions
Exam 10: Waiting Line Analysis and Simulation77 Questions
Exam 11: Process Design and Analysis57 Questions
Exam 12: Six Sigma Quality75 Questions
Exam 13: Statistical Quality Control73 Questions
Exam 14: Lean Supply Chains73 Questions
Exam 15: Logistics Distribution, and Transportation61 Questions
Exam 16: Global Sourcing and Procurement78 Questions
Exam 17: Enterprise Resource Planning Systems47 Questions
Exam 18: Forecasting101 Questions
Exam 19: Sales and Operations Planning65 Questions
Exam 20: Inventory Management108 Questions
Exam 21: Material Requirements Planning89 Questions
Exam 22: Workcenter Scheduling72 Questions
Exam 23: Theory of Constraints72 Questions
Exam 24: Health Care69 Questions
Exam 25: Operations Consulting61 Questions
Select questions type
In a process sequence where a product flows from process A to process B, process A is called the mother process.
(True/False)
4.8/5
(45)
According to the theory of constraints, a capacity-constrained resource (CCR) is one whose utilization is close to capacity and could be a bottleneck if it is not scheduled carefully.
(True/False)
4.8/5
(29)
A useful measure of inventory performance is called "dollar days." In which of the following areas are dollar days measurements not useful?
(Multiple Choice)
4.7/5
(35)
A way to find a bottleneck is to use one's knowledge of a particular plant, look at the system in operation, and talk with supervisors and workers.
(True/False)
4.8/5
(43)
Mr.Goldratt's "theory of constraints" is useful only in manufacturing settings.
(True/False)
4.8/5
(36)
What is a word indicating a resource whose capacity is less than the demand placed on it? _________________________________.
(Essay)
4.8/5
(38)
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?
(Multiple Choice)
4.7/5
(28)
The operational measure of throughput is "the rate at which money is generated by the system through production of goods and services that might be sold."
(True/False)
4.8/5
(38)
According to the theory of constraints, a bottleneck is any resource whose capacity is greater than the demand placed on it.
(True/False)
5.0/5
(39)
According to the theory of constraints, which of the following is a kind of time that makes up the cycle time in production?
(Multiple Choice)
4.8/5
(41)
Which of the following is one of Dr.Eli Goldratt's rules of production scheduling for optimized production technology?
(Multiple Choice)
4.9/5
(35)
According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?
(Multiple Choice)
4.7/5
(30)
Showing 61 - 72 of 72
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)