Exam 9: Systems Development and Project Management: Corporate Responsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In the past,outsourcing was often used tactically,as a quick-fix,short-term solution to a particular need or problem which did not form part of an overall business strategy.

(True/False)
4.8/5
(34)

User acceptance testing (UAT)determines if the system satisfies the user and business requirements.

(True/False)
4.9/5
(37)

Which of the following is not a characteristic of a well-defined project plan?

(Multiple Choice)
5.0/5
(40)

The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.

(True/False)
4.7/5
(32)

What is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors?

(Multiple Choice)
4.7/5
(40)

What is the most important part of the project plan?

(Multiple Choice)
4.9/5
(37)

What is a business requirement?

(Multiple Choice)
4.7/5
(28)

Project ____________ represent key dates when a certain group of activities must be performed.

(Short Answer)
4.9/5
(35)

Which methodology ends each day or begins with a stand-up meeting to monitor and control the development effort?

(Multiple Choice)
5.0/5
(39)

Information systems __________ reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability,confidentiality,and integrity.

(Short Answer)
4.8/5
(26)

Project constraints are factors considered to be true,real,or certain without proof or demonstration.

(True/False)
4.8/5
(34)

A dependency is a logical relationship that exists between the project tasks,or between a project task and a milestone.

(True/False)
4.8/5
(32)

_________ is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.

(Short Answer)
5.0/5
(37)

What is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted?

(Multiple Choice)
4.8/5
(34)

Unit testing uses both the legacy system and new system until all users verifies that the new system functions correctly.

(True/False)
4.9/5
(44)

What is a group of people who respond to users questions?

(Multiple Choice)
4.8/5
(42)

What are project assumptions?

(Multiple Choice)
4.7/5
(36)

What is a simple bar chart that depicts project tasks against a calendar?

(Multiple Choice)
4.9/5
(28)

Which reports present data that is distributed inside the organization and is intended for employees within an organization?

(Multiple Choice)
4.8/5
(35)

Project objectives are quantifiable criteria that must be met for the project to be considered a success.

(True/False)
4.9/5
(29)
Showing 181 - 200 of 289