Exam 9: Systems Development and Project Management: Corporate Responsibility
Exam 1: Management Information Systems: Business Driven MIS313 Questions
Exam 2: Decisions Processes: Value Driven Business329 Questions
Exam 3: Ebusiness: Electronic Business Value383 Questions
Exam 4: Ethics Information Security: MIS Business Concerns342 Questions
Exam 5: Infrastructures: Sustainable Technologies250 Questions
Exam 6: Data: Business Intelligence284 Questions
Exam 7: Networks: Mobile Business268 Questions
Exam 8: Enterprise Applications: Business Communications241 Questions
Exam 9: Systems Development and Project Management: Corporate Responsibility289 Questions
Select questions type
What breaks a project into tiny phases,and developers cannot continue on to the next phase until the first phase is complete?
(Multiple Choice)
4.9/5
(31)
The __________ phase establishes a high-level plan of the intended project and determines project goals.
(Short Answer)
4.7/5
(37)
Project scope statement links the project to the organization's overall business goals.It describes the business need (the problem the project will solve)and the justification,requirements,and current boundaries for the project.
(True/False)
5.0/5
(29)
Brainstorming is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted.
(True/False)
4.9/5
(35)
Status report periodic reviews of actual performance versus expected performance.
(True/False)
4.9/5
(26)
___________ outsourcing is using organizations from developing countries to write code and develop systems.
(Short Answer)
4.9/5
(34)
A requirements definition document prioritizes all of the business requirements by order of importance to the company.
(True/False)
4.7/5
(43)
Explain the three different types of outsourcing along with their benefits and challenges.
(Essay)
4.7/5
(36)
_____________ testing assess if the entire system meets the design requirements of the users.
(Short Answer)
4.9/5
(32)
Corrective maintenance makes system changes to reduce the chance of future system failure.
(True/False)
4.9/5
(31)
What is the outsourcing option that includes the most remote location and indirect customer control?
(Multiple Choice)
4.8/5
(32)
Project ______________ are any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
(Short Answer)
4.8/5
(42)
Exception reports organize and categorize data for managerial perusal.
(True/False)
4.8/5
(28)
The systems development life cycle (SDLC)is the overall process for developing information systems,from planning and analysis through implementation and maintenance.
(True/False)
4.7/5
(31)
_____________ are defects in the code of an information system.
(Short Answer)
4.8/5
(41)
What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?
(Multiple Choice)
4.8/5
(38)
Discovery prototyping builds a small-scale representation or working model of the system to ensure it meets the user and business requirements.
(True/False)
4.8/5
(37)
Showing 221 - 240 of 289
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)