Exam 9: Systems Development and Project Management: Corporate Responsibility

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not one of the four gates in the RUP methodology?

(Multiple Choice)
4.8/5
(37)

Post-implementation reports are formal reports or audits of a project after it is up-and-running.

(True/False)
4.8/5
(40)

Project ______________ are quantifiable criteria that must be met for the project to be considered a success.

(Short Answer)
4.7/5
(34)

Off-the-shelf application software supports general business processes and does not require any specific software customization to meet the organization's needs.

(True/False)
4.8/5
(33)

Pilot implementation installs the new system in phases (for example by department)until it is verified that it works correctly.

(True/False)
4.9/5
(47)

Project ________________ are factors considered to be true,real,or certain without proof or demonstration.

(Short Answer)
4.8/5
(36)

What determines if the system satisfies the user and business requirements?

(Multiple Choice)
4.9/5
(40)

__________ objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.

(Short Answer)
4.8/5
(44)

The project managers are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion.

(True/False)
4.9/5
(37)

The rapid application development methodology emphasizes extensive user involvement in the rapid and evolutionary construction of working __________ of a system to accelerate the systems development process.

(Short Answer)
4.8/5
(37)

_____________ implementation installs the new system in phases (for example by department)until it is verified that it works correctly.

(Short Answer)
4.8/5
(45)

What is the success rate for a project using the waterfall methodology?

(Multiple Choice)
4.8/5
(29)

Which phase takes all the detailed design documents from the design phase and transforms them into the actual system?

(Multiple Choice)
4.9/5
(41)

What are the three primary variables (or triple constraints)in any project?

(Multiple Choice)
4.8/5
(41)

What verifies that the units or pieces of code function correctly when integrated together?

(Multiple Choice)
4.7/5
(32)

What occurs when programmers test the system to ensure it is bug-free?

(Multiple Choice)
4.8/5
(35)

What is a set of policies,procedures,standards,processes,practices,tools,techniques,and tasks that people apply to technical and management challenges?

(Multiple Choice)
4.8/5
(27)

What is the critical path?

(Multiple Choice)
4.7/5
(37)

Which of the following is the primary reason why companies outsource?

(Multiple Choice)
4.9/5
(34)

What is a person or event that is the catalyst for implementing major changes for a system to meet business changes?

(Multiple Choice)
4.9/5
(39)
Showing 81 - 100 of 289
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)