Sign-off is the users' actual signatures indicating they approve all of the business requirements.

(True/False)
4.8/5
(37)

The project ______________ document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.

(Short Answer)
4.8/5
(31)

_____________ development consists of a series of tiny projects.It has become the foundation of multiple agile methodologies.

(Short Answer)
4.7/5
(35)

Which of the following does a project manager perform?

(Multiple Choice)
4.8/5
(34)

The ___________ methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

(Short Answer)
4.9/5
(41)

Which of the following describes agile?

(Multiple Choice)
4.9/5
(37)

Which phase establishes a high-level plan of the intended project and determines project goals?

(Multiple Choice)
4.9/5
(36)

Control objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.

(True/False)
4.8/5
(24)

System ___________ verifies that the units or pieces of code function correctly when integrated together.

(Short Answer)
4.8/5
(34)

A Pert chart is a simple bar chart that lists project tasks vertically against the project's time frame,listed horizontally.

(True/False)
4.8/5
(42)

The _________ phase involves placing the system into production so users can begin to perform actual business operations with the system.

(Short Answer)
4.9/5
(41)

Development Testing assess if the entire system meets the design requirements of the users.

(True/False)
4.8/5
(38)

__________________ testing verifies that separate systems can work together passing data back and forth correctly.

(Short Answer)
4.8/5
(41)

Preventative maintenance makes system changes to reduce the chance of future system failure.

(True/False)
4.9/5
(35)

What defines the how,what,when,and who regarding the flow of project information to stakeholders and is key for managing expectations?

(Multiple Choice)
4.8/5
(37)

Rational _________ process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four "gates."

(Short Answer)
4.9/5
(39)

Planning,___________,design,development,testing,implementation,and maintenance are the seven phases in the SDLC.

(Short Answer)
4.8/5
(33)

_____________ training is held in a classroom environment and led by an instructor.

(Short Answer)
4.8/5
(36)

Preventing liabilities is a business-related consequence of failed software.

(True/False)
4.8/5
(32)

The R in the SMART criteria for successful objective creation stands for _________.

(Short Answer)
4.9/5
(37)