Exam 5: New Product Development

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In the investigation phase,the development of alternatives encompasses all of the following considerations,except one.Which does not belong to the list?

Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
Verified

A

Which of the following is not one of the typical questions to ask prior to inviting a supplier into the design process as presented in the book?

Free
(Multiple Choice)
4.9/5
(33)
Correct Answer:
Verified

E

Early Supply Management Involvement was formerly called Early Supplier Involvement (ESI).

Free
(True/False)
4.8/5
(37)
Correct Answer:
Verified

False

Which of the following is not a generalization about value?

(Multiple Choice)
4.9/5
(26)

Early Supply Management involvement often requires policy development from upper management to ensure initial involvement.

(True/False)
5.0/5
(43)

Which of the following questions does not typically belong on a value-engineering checklist?

(Multiple Choice)
4.7/5
(33)

Supply managers must add value to the design process in order to become a viable and lasting member of the design team.

(True/False)
4.7/5
(38)

Value engineering is focused on the production stage.

(True/False)
4.8/5
(43)

Which of the following is not one of the design process phases given in the textbook?

(Multiple Choice)
4.8/5
(32)

Value engineering is a systematic study of every element of cost in a material,item of equipment,service or construction project that is conducted by design engineering only.

(True/False)
4.8/5
(37)

Which of the following is not one of the recommendations given in the textbook for supply management to do so that the supply department's involvement in design is viewed by engineering as an asset and not a nuisance?

(Multiple Choice)
4.9/5
(39)

In analyzing each part in VA/VE,which is not a typical question asked?

(Multiple Choice)
4.8/5
(36)

The design stage provides the greatest opportunity to reduce costs the life cycle costs of products.Supply management and the firm's suppliers have major contributions to make during this process.

(True/False)
5.0/5
(38)

Which of the following is not one of the typical questions to ask prior to inviting a supplier into the design process as presented in the book?

(Multiple Choice)
4.8/5
(37)

Which of the following is not associated with the development phase of the design process?

(Multiple Choice)
4.9/5
(43)

After realizing true costs in the production stage,the design stage provides the second greatest opportunity to reduce costs the life cycle costs of products.

(True/False)
4.7/5
(44)

Early Supply Management involvement was formerly called Early Purchasing Involvement (EPI).

(True/False)
4.8/5
(32)

Which of the following is not associated with the development phase of the design process?

(Multiple Choice)
4.9/5
(35)

Which of the following questions does not typically belong on a value-engineering checklist?

(Multiple Choice)
4.9/5
(35)

Value engineering is a systematic study of every element of cost in a material,item of equipment,service or construction project to ensure that every element of cost fulfills a necessary function and at the lowest possible total cost.

(True/False)
4.8/5
(44)