Which of the following is not true of Six Sigma at GE?

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

D

Product testing objectives should be implemented after a supplier has been selected,not before selection.

Free
(True/False)
4.8/5
(33)
Correct Answer:
Verified

False

Which of the following is not a key element of Total Quality Management?

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

B

Which of the following is not one of Deming's fourteen points?

(Multiple Choice)
4.7/5
(40)

A SM firm views its quality system and the supplier's quality system as two parts of a single integrated system.

(True/False)
4.9/5
(39)

Which of the following is not true of the PDCA cycle?

(Multiple Choice)
4.8/5
(29)

Which of the following is not true of the costs of quality?

(Multiple Choice)
4.8/5
(31)

Which of the following is generally not an option if inspection is needed and a rejection occurs?

(Multiple Choice)
4.9/5
(37)

Which of the following is not a step in the Total Quality Management figure presented in the textbook?

(Multiple Choice)
4.9/5
(38)

Sequential sampling continues the sample taking until the lot is either: fully inspected,rejected,or accepted.

(True/False)
4.8/5
(39)

Which of the following is not a quality management approach presented in the textbook?

(Multiple Choice)
4.8/5
(39)

Which of the following is not a step in the Total Quality Management figure presented in the textbook?

(Multiple Choice)
4.9/5
(39)

Quality management is a major component of supply management's responsibility.

(True/False)
4.8/5
(33)

The term "tool" emerged from the use of the methodologies in small group improvement efforts,such as quality circles,wherein the group would focus on solving a problem by using a mix of the methodologies.

(True/False)
4.8/5
(43)

Which of the following is not true of the costs of quality?

(Multiple Choice)
5.0/5
(28)

Supply professionals that plan to guide their organization and chain to SM need not concern themselves with the management of quality within their own facilities and those of their suppliers.A quality management department is usually responsible for quality.

(True/False)
4.9/5
(41)

Which of the following points does not describe part of the evolution of quality management?

(Multiple Choice)
4.8/5
(38)

Which of the following is not a Six Sigma theme?

(Multiple Choice)
4.9/5
(36)

Which of the following is not a quality award?

(Multiple Choice)
4.8/5
(45)

P-D-C-A describes the basic logic for data-driven continuous process improvement.

(True/False)
4.8/5
(38)