Exam 21: CD - Inventory Management With Known Demand
Exam 1: Introduction28 Questions
Exam 2: Linear Programming: Basic Concepts83 Questions
Exam 3: Linear Programming: Formulation and Applications58 Questions
Exam 4: The Art of Modeling With Spreadsheets31 Questions
Exam 5: What-If Analysis for Linear Programming63 Questions
Exam 6: Network Optimization Problems48 Questions
Exam 7: Using Binary Integer Programming to Deal With Yes-Or-No Decisions26 Questions
Exam 8: Nonlinear Programming53 Questions
Exam 9: Decision Analysis77 Questions
Exam 10: Cd Supplement - Decision Analysis26 Questions
Exam 11: Forecasting76 Questions
Exam 12: Queueing Models75 Questions
Exam 13: CD Supplement - Additional Queueing Models8 Questions
Exam 14: Computer Simulation: Basic Concepts45 Questions
Exam 15: CD Supplement - the Inverse Transformation Method for Generating Random Observations2 Questions
Exam 16: Computer Simulation With Crystal Ball53 Questions
Exam 17: CD - Solution Concepts for Linear Programming45 Questions
Exam 18: CD - Transportation and Assignment Problems48 Questions
Exam 19: CD - Pertcpm Models for Project Management93 Questions
Exam 20: CD - Goal Programming21 Questions
Exam 21: CD - Inventory Management With Known Demand64 Questions
Exam 22: CD - Inventory Management With Uncertain Demand43 Questions
Select questions type
Which of the following is not true for the EOQ model with gradual replenishment?
Free
(Multiple Choice)
4.7/5
(36)
Correct Answer:
D
When developing an inventory policy,the only relevant costs are the variable costs.
Free
(True/False)
4.8/5
(36)
Correct Answer:
True
Which of the following is not included in setup costs?
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
E
Estimating shortage costs is quite challenging because it is difficult to predict the consequences of shortages.
(True/False)
4.8/5
(36)
In the EOQ model with quantity discounts,if holding costs are given as a percentage of unit price,a graph of the total cost curves will have the same EOQ for each curve.
(True/False)
4.7/5
(43)
The JIT philosophy is one of avoiding waste wherever it might occur in the production process.
Multiple Choice Questions
(True/False)
4.7/5
(39)
Setup costs can occur through purchasing or manufacturing products.
(True/False)
4.9/5
(36)
EOQ inventory models are basically concerned with the timing of orders.
(True/False)
4.7/5
(36)
Inspection of goods for quality and quantity upon arrival is part of setup costs.
(True/False)
4.7/5
(33)
If she was to order 80 pounds of pepperoni at a time,what would be the length of an order cycle?
(Multiple Choice)
4.8/5
(34)
MRP is a system for determining optimal order quantities for dependent-demand products.
(True/False)
4.9/5
(44)
Which of the following would generally have independent demand?
(Multiple Choice)
4.8/5
(44)
An inventory system whose current inventory level is monitored with each change is called a periodic-review system.
(True/False)
4.8/5
(34)
In the basic EOQ model,if annual demand doubles what is the effect on the EOQ?
(Multiple Choice)
4.8/5
(32)
If the cost of holding inventory is high relative to shortage costs,then allowing shortages may be a good policy.
(True/False)
4.8/5
(40)
Which of the following items would be most likely to have dependent demand?
(Multiple Choice)
4.9/5
(38)
Showing 1 - 20 of 64
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)