Exam 22: Systems Design, implementation, and Operation
Exam 1: Accounting Information Systems: an Overview79 Questions
Exam 2: Overview of Transaction Processing and Erp Systems74 Questions
Exam 3: Systems Documentation Techniques83 Questions
Exam 4: Relational Databases80 Questions
Exam 5: Computer Fraud46 Questions
Exam 6: Computer Fraud and Abuse Techniques45 Questions
Exam 7: Control and Accounting Information Systems96 Questions
Exam 8: Information Systems Controls for System Reliability Part 1: Information Security53 Questions
Exam 9: Information Systems Controls for Systems Reliability Part 2: Confidentiality and Privacy24 Questions
Exam 10: Information Systems Controls for Systems Reliability Part 3: Processing Integrity and Availability63 Questions
Exam 11: Auditing Computer-Based Information Systems72 Questions
Exam 12: The Revenue Cycle: Sales to Cash Collections81 Questions
Exam 13: The Expenditure Cycle: Purchasing to Cash Disbursements83 Questions
Exam 14: The Production Cycle68 Questions
Exam 15: The Human Resources Management and Payroll Cycle58 Questions
Exam 16: General Ledger and Reporting System57 Questions
Exam 17: The Rea Data Model61 Questions
Exam 18: Implementing an Rea Model in a Relational Database68 Questions
Exam 19: Special Topics in Rea Modeling72 Questions
Exam 20: Introduction to Systems Development Systems Analysis90 Questions
Exam 21: Ais Development Strategies73 Questions
Exam 22: Systems Design, implementation, and Operation70 Questions
Select questions type
Which of the following lists represent the sequence of elements in developing the conceptual design specifications?
(Multiple Choice)
4.9/5
(33)
The decision about how often to produce a certain report is part of which conceptual design specification element?
(Multiple Choice)
4.8/5
(34)
Which of the following is not a reason for preparing the conceptual systems design report?
(Multiple Choice)
5.0/5
(32)
What factors does a steering committee consider when evaluating different system designs?
(Essay)
4.9/5
(28)
Which of the following activities is not part of data conversion?
(Multiple Choice)
4.9/5
(36)
What output design considerations should be analyzed as part of the physical system design phase?
(Essay)
4.7/5
(36)
Describe the different types of documentation that should be prepared for a new system.
(Essay)
4.9/5
(41)
Write one question that should be asked about each of the controls design considerations.
(Essay)
5.0/5
(28)
Which of the following is the final activity in the systems development life cycle?
(Multiple Choice)
4.8/5
(38)
Which consideration below is not considered important to output design?
(Multiple Choice)
4.7/5
(42)
Who is responsible for identifying such risk factors in an implementation plan?
(Multiple Choice)
4.9/5
(38)
One of the purposes of the ________ is to guide physical systems design activities.
(Multiple Choice)
4.8/5
(32)
What type of conversion terminates the old system as soon as the new system is ready?
(Multiple Choice)
4.8/5
(36)
An analyst who asks the question,"Does the system produce actual and complete data?" is investigating what postimplementation factor?
(Multiple Choice)
4.8/5
(37)
All of the following reports have pre-specified content and format except
(Multiple Choice)
4.9/5
(40)
At what point in the systems development life cycle does the company determine how the conceptual AIS design is to be implemented?
(Multiple Choice)
4.8/5
(35)
What type of system test determines whether a program is operating as designed?
(Multiple Choice)
4.9/5
(30)
Showing 21 - 40 of 70
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)