Exam 20: Introduction to Systems Development Systems Analysis
Exam 1: Accounting Information Systems: an Overview79 Questions
Exam 2: Overview of Transaction Processing and Erp Systems74 Questions
Exam 3: Systems Documentation Techniques83 Questions
Exam 4: Relational Databases80 Questions
Exam 5: Computer Fraud46 Questions
Exam 6: Computer Fraud and Abuse Techniques45 Questions
Exam 7: Control and Accounting Information Systems96 Questions
Exam 8: Information Systems Controls for System Reliability Part 1: Information Security53 Questions
Exam 9: Information Systems Controls for Systems Reliability Part 2: Confidentiality and Privacy24 Questions
Exam 10: Information Systems Controls for Systems Reliability Part 3: Processing Integrity and Availability63 Questions
Exam 11: Auditing Computer-Based Information Systems72 Questions
Exam 12: The Revenue Cycle: Sales to Cash Collections81 Questions
Exam 13: The Expenditure Cycle: Purchasing to Cash Disbursements83 Questions
Exam 14: The Production Cycle68 Questions
Exam 15: The Human Resources Management and Payroll Cycle58 Questions
Exam 16: General Ledger and Reporting System57 Questions
Exam 17: The Rea Data Model61 Questions
Exam 18: Implementing an Rea Model in a Relational Database68 Questions
Exam 19: Special Topics in Rea Modeling72 Questions
Exam 20: Introduction to Systems Development Systems Analysis90 Questions
Exam 21: Ais Development Strategies73 Questions
Exam 22: Systems Design, implementation, and Operation70 Questions
Select questions type
The capital budgeting technique where estimated future cash flows are discounted back to the present is referred to as
Free
(Multiple Choice)
4.7/5
(33)
Correct Answer:
C
The system objective concerned that crucial information be produced first,and then less important items as time permits is known as
Free
(Multiple Choice)
4.7/5
(35)
Correct Answer:
C
The type of user resistance in which data are erroneously entered into a system is called
Free
(Multiple Choice)
4.9/5
(32)
Correct Answer:
B
The ________ method of gathering information helps to determine how a system actually works.
(Multiple Choice)
4.8/5
(36)
A system change that results in an improved product or service and helps lower costs provided a(n)
(Multiple Choice)
4.7/5
(35)
Which group of professionals is responsible for planning and monitoring a project to ensure timely and cost-effective completion?
(Multiple Choice)
4.7/5
(47)
Major resistance to change takes one of several forms.What is the name of the form of resistance where the new system is blamed for any and every unpleasant occurrence?
(Multiple Choice)
4.9/5
(24)
Which data gathering method is most helpful to deal with the question: "Why?"
(Multiple Choice)
4.7/5
(41)
Who makes up the project development team and what is the team's purpose?
(Essay)
4.8/5
(27)
Refer to the diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? 

(Multiple Choice)
4.8/5
(33)
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ________ step in the systems development life cycle,the team defined the procedures to back up and secure system data.
(Multiple Choice)
4.9/5
(42)
In which systems analysis step do analysts conduct an extensive study of the present system to gain a thorough understanding of how it works?
(Multiple Choice)
4.9/5
(35)
Who is responsible for preparing the specifications that are used to create the programs?
(Multiple Choice)
4.8/5
(32)
In which phase of the systems development life cycle is the feasibility study first performed?
(Multiple Choice)
4.8/5
(29)
A Logical model used to gather information about an existing system
(Multiple Choice)
4.8/5
(34)
The question of what the project should and should not accomplish is determined in what step of systems analysis?
(Multiple Choice)
4.8/5
(38)
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ________ step in the systems development life cycle,the team has determined that the objectives of the project can be accomplished by installing a new computer system or by upgrading the existing system.
(Multiple Choice)
4.9/5
(29)
What is the basic model used to create a framework for economic feasibility analysis?
(Multiple Choice)
4.9/5
(31)
There are several important aspects to be considered during a feasibility study.The aspect that asks the question,"Can people use the system and will they use it?" is called
(Multiple Choice)
4.7/5
(35)
An antiquated information system used by an office supply manufacturer caused customer dissatisfaction since it took two days to process a telephone order.After the system was upgraded and redesigned,the time to process a telephone order was reduced to three minutes.This is a prime example of
(Multiple Choice)
4.8/5
(37)
Showing 1 - 20 of 90
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)