Exam 12: Systems Project Management, implementation, operation, control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The second major step in systems implementation is

(Multiple Choice)
4.8/5
(39)

The execution of the systems implementation should begin with

(Multiple Choice)
4.7/5
(34)

Presented below is a list of terms related to project leader responsibilities. Required: For each term,insert the letter for the project leader responsibility to which the term relates.Use P for planning,S for scheduling,and C for control.Each letter will be used more than once. ________ 1.Progress and time reporting ________ 2.Uses PERT network charts ________ 3.Resource allocation ________ 4.Status reports to management ________ 5.Uses a project accounting system ________ 6.Project breakdown ________ 7.Task assignment ________ 8.Related to successive refinement of the project plan ________ 9.Activity/task scheduling ________ 10.Its objective is to facilitate resource assignment and control

(Short Answer)
4.8/5
(35)

The task completion schedule,based on task time estimates,should be maintained without revision if at all possible.

(True/False)
4.8/5
(32)

The project leader uses a project accounting system to fulfill his or her project control responsibilities.

(True/False)
4.9/5
(40)

A group of software components needed to deliver a workable application is called a(n)

(Multiple Choice)
4.7/5
(43)

Examples of "all-in-one" and Integrated Platforms application suites are

(Multiple Choice)
5.0/5
(39)

The process of changing input data into a format readable by the new system hardware is called

(Multiple Choice)
4.9/5
(35)

The BPEL service engine needs a roadmap which is a set of visual diagrams based on the Unified Modeling Language and/or Business Process Modeling Notation.

(True/False)
4.9/5
(40)

The application solution stack for a Web application typically includes the following except

(Multiple Choice)
4.7/5
(38)

The Software Versioning System keeps both current and historical versions of the

(Multiple Choice)
4.8/5
(39)

Within the project development environment the project collaboration platform serves to optimize management of the implementation of a systems development life cycle.

(True/False)
4.8/5
(39)

The SPICE approach categorizes processes into five broad areas and scores "capability level" on a 10-point scale.

(True/False)
4.8/5
(37)

A software versioning system keeps only the current version of software source code available so version control issues are minimized.

(True/False)
4.9/5
(46)

The appropriate level of detail to be obtained from a project accounting system is generally decided by the chief information officer.

(True/False)
4.8/5
(34)

Which of the following activities occurs during the detailed systems design phase?

(Multiple Choice)
4.7/5
(34)

There is no general agreement of standard project phases and tasks in current project management literature and therefore there are no commonly accepted time estimates or standard processing rates.However,there is agreement as to several points related to the estimation process.Which of the following is not an agreed-upon point in the estimation process?

(Multiple Choice)
4.8/5
(37)

Time estimate standards developed in-house generally are less effective than standards or estimates available in current project management literature.

(True/False)
4.8/5
(41)

For an applications system project,the individual who should be included in the project team because he or she has the best working knowledge of how the application should function in the actual work environment is

(Multiple Choice)
4.7/5
(37)

Within the project development environment the software application framework provides a structured environment in which to develop software.

(True/False)
4.9/5
(43)
Showing 41 - 60 of 135
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)