Exam 12: Systems Project Management, implementation, operation, control
Exam 1: Accounting Information Systems: An Overview163 Questions
Exam 2: Systems Techniques and Documentation136 Questions
Exam 3: Ebusiness and Ecommerce121 Questions
Exam 4: Transaction Processing and the Internal Control Process138 Questions
Exam 5: Fraud Examination and Fraud Management134 Questions
Exam 6: Information Systems Security172 Questions
Exam 7: Electronic Data Processing Systems128 Questions
Exam 8: Revenue Cycle Processes128 Questions
Exam 9: Procurement and Human Resources Business Processes121 Questions
Exam 10: The Production Business Process130 Questions
Exam 11: Systems Planning, analysis, and Design163 Questions
Exam 12: Systems Project Management, implementation, operation, control135 Questions
Exam 13: Data Management Concepts147 Questions
Exam 14: Auditing Information Technology126 Questions
Select questions type
Purposely or inadvertently submitting unreasonably low time or cost estimates is known as lowballing.
(True/False)
4.9/5
(46)
To determine the activities that are critical to keeping a project on schedule,________ ________ must be obtained for each individual activity of the project.
(Short Answer)
4.8/5
(38)
Regarding Web application coding,one could correctly say that
(Multiple Choice)
4.8/5
(29)
The Weapons Testing Laboratory is implementing a new computer system.It desires to use the safest final system testing approach.It should choose
(Multiple Choice)
4.8/5
(38)
In all operational systems it becomes necessary to make changes.A change made because of a computer programming error not detected until the system begins operation is typically caused by a(n)
(Multiple Choice)
4.9/5
(42)
The tools and technologies used to implement a given project are in the
(Multiple Choice)
4.9/5
(36)
Presented below is a list of terms relating to accounting information systems,followed by definitions of those terms.
Required: Match the letter next to each definition with the appropriate term.Each answer will be used only once.
________ 1.Network diagram
________ 2.Parallel operation
________ 3.Modular conversion
________ 4.Project management
________ 5.Cutover point
________ 6.Downtime
________ 7.Bug
________ 8.Critical path
________ 9.Lowballing
A.A moment in time under the direct approach to implementation where the switch to a new system is made
B.Involves running the new and old systems simultaneously before final conversion
C.The percentage of time that equipment is unavailable for use
D.A scheduling technique that depicts the order in which the activities must be performed
E.Purposely or inadvertently submitting unreasonably low time or cost estimates to obtain a contract
F.Tools used to track progress and manage resources for a systems development project
G.Computer programming error that is not detected until the program is in use
H.A list of activities that are crucial in that if any one of them is delayed,the entire project will be delayed
I.An approach to implementation that involves phasing in a new system in segments
(Short Answer)
4.9/5
(37)
The ________ ________ Framework provides a structured environment in which to develop software.
(Short Answer)
4.9/5
(44)
Presented below is a list of terms relating to accounting information systems, followed by definitions of those terms.
Match the appropriate term with each definition. Each answer will be used only once.
Match the appropriate term with each definition. Each answer will be used only once.
Correct Answer:
Premises:
Responses:
(Matching)
4.8/5
(35)
The design specifications for a computer program are determined by
(Multiple Choice)
4.8/5
(38)
Briefly describe the following three methods of converting from an old system to a new system,and give the advantages and disadvantages of each:
• direct approach
• parallel operation
• modular conversion
(Essay)
5.0/5
(36)
One training method that makes use of current technological advances is computer-assisted training.
(True/False)
4.9/5
(42)
It is a good assumption that employees will learn to use a new system by themselves.
(True/False)
4.7/5
(39)
Showing 121 - 135 of 135