Exam 12: Systems Project Management, implementation, operation, control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

________ ________ should be submitted to the steering committee in writing.

(Short Answer)
4.8/5
(40)

In the project development environment,serving to manage the communication chain is the

(Multiple Choice)
4.8/5
(44)

Under the SPICE approach,the processes are categorized into the below except

(Multiple Choice)
5.0/5
(31)

Many experts believe that eventually,in the future,all end-user software will run in ________ browsers.

(Short Answer)
4.9/5
(40)

________ is necessary to ensure that the new system operates as planned.

(Short Answer)
4.8/5
(48)

What are some of the reasons why time estimates are often inaccurate?

(Essay)
4.9/5
(39)

Which of the following groups of individuals should be on the special project team that executes the implementation of the design plan?

(Multiple Choice)
4.8/5
(33)

What is the ultimate objective of breaking down an overall new systems development project into phases? How is this process accomplished?

(Essay)
4.9/5
(34)

Which of the following is not an aspect of good project control?

(Multiple Choice)
4.8/5
(40)

A major problem with a system that is down too much is ________ ________ for the company.

(Short Answer)
4.7/5
(35)

Selecting and training personnel is one of the implementation activities that are carried out based on the design plan.

(True/False)
4.8/5
(41)

From a control point of view,virtually all factors that relate to information systems are measured in terms of dollars.

(True/False)
4.9/5
(39)

The testing approach in which the old system is abandoned and the processing is switched to the new system is called

(Multiple Choice)
4.9/5
(39)

Individual server-side development frameworks tend to be related to specific programming languages such as

(Multiple Choice)
4.9/5
(43)

Which of the following can serve as both a training tool for new employees and a help for future computer programming?

(Multiple Choice)
4.8/5
(42)

The test data approach should not be designed to "break" the computer program.

(True/False)
4.8/5
(26)

If data are input into the project accounting system that is both accurate and timely,it can produce revised cost estimates that are both accurate and timely.

(True/False)
4.7/5
(28)

Which tools would an auditor engaged in examining an information system use in conducting the audit?

(Multiple Choice)
4.8/5
(43)

ISO 15504 (SPICE)is a process-based development approach that focuses on the "maturity" of the process being developed.

(True/False)
4.9/5
(32)

One of the most important parts of systems implementation that is often overlooked or minimized is

(Multiple Choice)
4.9/5
(42)
Showing 81 - 100 of 135
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)