Exam 13: Accounting System Development

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

What is the software development prototype methodology?

Free
(Essay)
4.8/5
(33)
Correct Answer:
Verified

Prototyping methodology collects some user requirements to analyze, design, and build a prototype. The prototype or sample is shown to the user to obtain feedback. The revised user requirements are utilized to analyze, design, and revise the prototype. This is repeated as necessary until the prototype is complete and meets user requirements. When the prototype is approved, it is built, tested, installed, and operated.

One activity included in the analysis phase of SDLC is developing budgets.

Free
(True/False)
4.8/5
(38)
Correct Answer:
Verified

False

Which phase in the SDLC typically takes the longest?

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

B

Which of the activities are performed in the design phase of the SDLC?

(Multiple Choice)
4.9/5
(32)

A(n)________ is an IT professional who designs and writes the software for applications, such as accounting software.

(Short Answer)
4.7/5
(37)

When a system can no longer be maintained, no longer satisfies enterprise requirements, or fails to address new opportunities, it will be replaced with a new system, and a new system development life cycle begins.

(True/False)
4.8/5
(37)

The SDLC provides a common language for communicating with programmers, system analysts, database administrators, and other IT professionals engaged in accounting system development.

(True/False)
4.9/5
(36)

Match the design feasibility name to the appropriate definition. A)Assesses whether the new system IT architecture can interact with the existing IT architecture that will remain in use B)Evaluates whether the current IT personnel and enterprise users can run the new system hardware and software C)Assesses the probability of successful implementation and use of the new system, including any legal considerations D)Considers whether the environment of the enterprise is conducive to the changes and adaptations required by the new system E)Analyzes the costs and benefits of the new system F)Evaluates whether the new system deliverables can be delivered by the required due dates -Operational feasibility

(Short Answer)
4.9/5
(39)

The baseline stage of the ABC methodology of software development has now many basic steps?

(Multiple Choice)
5.0/5
(38)

The ________ methodology collects some user requirements to analyze, design, and build a sample to show the user to obtain feedback.

(Short Answer)
4.8/5
(28)

An example of an off-the-shelf accounting software for small businesses is ________.

(Short Answer)
4.9/5
(41)

What is one advantage of using a baseline module?

(Multiple Choice)
4.9/5
(38)

The ________ methodology completes the SDLC phases in order starting with the planning phase and completing each phase, one after the other in PAD-BID order.

(Short Answer)
4.9/5
(42)

The establishment a vision and broad strategic framework for a new system occurs in the ________ phase of the SDLC.

(Short Answer)
4.8/5
(32)

Match the category in Weatherbe's PIECES framework with the appropriate definition. A)A problem that relates to security of the system B)A problem that impacts business operations C)A problem that relates to system problems, such as system availability D)A problem that impacts revenues (benefits)or costs E)A problem that relates to confidentiality, integrity (accuracy and completeness), or availability of data F)A problem that pertains to the proficiency of the current system -Information problem

(Short Answer)
4.8/5
(33)

Match the design feasibility name to the appropriate definition. A)Assesses whether the new system IT architecture can interact with the existing IT architecture that will remain in use B)Evaluates whether the current IT personnel and enterprise users can run the new system hardware and software C)Assesses the probability of successful implementation and use of the new system, including any legal considerations D)Considers whether the environment of the enterprise is conducive to the changes and adaptations required by the new system E)Analyzes the costs and benefits of the new system F)Evaluates whether the new system deliverables can be delivered by the required due dates -Economic feasibility

(Short Answer)
4.9/5
(34)

List and define the categories in Weatherbe's PIECES framework for problem analysis.

(Essay)
4.7/5
(33)

Based on the system analysis, new system models are designed including the following except

(Multiple Choice)
4.9/5
(33)

Requirement analysis involves collecting current system models consisting of database models, business process models, and people models.

(True/False)
4.9/5
(36)

A ________ analysis identifies any difference between the specifications of the baseline accounting system and the enterprise-specific user requirements.

(Short Answer)
4.9/5
(31)
Showing 1 - 20 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)