Exam 13: Accounting System Development

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

What are the basic steps in the waterfall methodology?

(Essay)
4.8/5
(34)

In the prototyping methodology of software development, all the user requirements are gathered and analyzed before the product is built.

(True/False)
4.9/5
(39)

In Weatherbe's PIECES framework for problem analysis, A service problem relates to system problems with service either to enterprise users or customers.

(True/False)
4.8/5
(32)

The ________ involves operating and maintaining the new system until it no longer satisfies the organization's needs.

(Short Answer)
4.8/5
(30)

Which stage of the ABC methodology of software development focusses on the features common to most accounting systems?

(Multiple Choice)
4.9/5
(30)

Accounting professionals are often the end users of the accounting system.

(True/False)
4.8/5
(29)

The plan phase of a SDLC involves designing new system models to satisfy user requirements, either by creating a new model or by modifying existing models.

(True/False)
4.9/5
(34)

________ feasibility evaluates whether the current IT personnel and enterprise users can operate the new system hardware and software.

(Short Answer)
4.8/5
(34)

The prototyping methodology of software development has how many basic steps?

(Multiple Choice)
4.8/5
(36)

What type of technology is typically used in an accounting system?

(Essay)
4.8/5
(26)

What project management activities are typically conducted in the planning phase of the SDLC?

(Essay)
5.0/5
(39)

Which category in Weatherbe's PIECES framework affects revenues (benefits)or costs?

(Multiple Choice)
4.9/5
(38)

________ modeling involves preparing a pictorial representation of the entire accounting system.

(Short Answer)
4.8/5
(38)

You are a staff accountant at manufacturing firm. IT is installing an new accounting system and would like to run the legacy system in parallel with the new system for a few weeks. Your boss, wanting to keep costs down, wants to stop using the legacy system as soon as the new system is installed. Prepare an email stating why the legacy system should run in parallel with the new system.

(Essay)
4.8/5
(36)

What is the software development waterfall methodology?

(Essay)
4.9/5
(39)

How many times does the plan phase occur in the ABC methodology of software development?

(Multiple Choice)
4.7/5
(38)

System development life cycle is the order and timing of when the SDLC phases are completed.

(True/False)
4.8/5
(30)

What are the basic steps in the prototype methodology?

(Essay)
4.8/5
(36)

What are the main functions of an accounting system?

(Essay)
4.8/5
(36)

Database modeling consists of preparing a pictorial representation of the accounting database.

(True/False)
4.8/5
(35)
Showing 61 - 80 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)