________ is the order and timing of when the SDLC phases are completed.

(Short Answer)
4.8/5
(41)

What type of IT professionals are involved in the design and development of the accounting system?

(Essay)
4.7/5
(35)

________ feasibility assesses whether the new system IT architecture can interact with the existing IT architecture that will remain in use.

(Short Answer)
4.8/5
(38)

________ activities are conducted in more than one SDLC phase.

(Short Answer)
4.8/5
(25)

Which of the following is an advantage of the waterfall methodology of software development over the prototyping methodology?

(Multiple Choice)
5.0/5
(42)

Database developers design and write the software for applications, such as accounting software.

(True/False)
4.8/5
(38)

Match the category in Weatherbe's PIECES framework with the appropriate definition. A)A problem that relates to security of the system B)A problem that impacts business operations C)A problem that relates to system problems, such as system availability D)A problem that impacts revenues (benefits)or costs E)A problem that relates to confidentiality, integrity (accuracy and completeness), or availability of data F)A problem that pertains to the proficiency of the current system -Performance problem

(Short Answer)
4.9/5
(34)

Which of the following is an advantage of the ABC methodology of software development over the waterfall methodology?

(Multiple Choice)
4.8/5
(38)

What is the software development ABC methodology?

(Essay)
4.9/5
(49)

Which category in Weatherbe's PIECES framework relates to confidentiality, integrity (accuracy and completeness), or availability of data?

(Multiple Choice)
4.7/5
(37)

Match the category in Weatherbe's PIECES framework with the appropriate definition. A)A problem that relates to security of the system B)A problem that impacts business operations C)A problem that relates to system problems, such as system availability D)A problem that impacts revenues (benefits)or costs E)A problem that relates to confidentiality, integrity (accuracy and completeness), or availability of data F)A problem that pertains to the proficiency of the current system -Economic problem

(Short Answer)
4.7/5
(34)

________ is a series of phases used to create a system: plan, analyze, design, build/buy, install, and deploy.

(Short Answer)
4.7/5
(31)

What does the system development methodology define?

(Multiple Choice)
4.8/5
(41)

The main reasons for project failure relate to activities that were not properly addressed in the first phase of the SDLC, the planning of the new system project.

(True/False)
4.8/5
(30)

Which of the following is a benefit of using the ABC methodology of software development?

(Multiple Choice)
4.9/5
(38)

What does the system development life cycle define?

(Multiple Choice)
4.8/5
(48)

A ________ determines the specific order and progression of how and when the phases of the SDLC are performed.

(Short Answer)
4.7/5
(31)

List and define the phases of the SDLC.

(Essay)
4.8/5
(35)

According to Weatherbe's PIECES framework for problem analysis, a problem that relates to system issues, such as system availability, is classified as a ________ problem.

(Short Answer)
4.8/5
(40)

Which software methodology more closely reflects the methodology used in practice today for most systems development?

(Multiple Choice)
5.0/5
(45)
Showing 21 - 40 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)