Exam 18: Introduction to Systems Development and Systems Analysis
Exam 1: Accounting Information Systems83 Questions
Exam 2: Overview of Business Processes105 Questions
Exam 3: Systems Development and Documentation Techniques99 Questions
Exam 4: Relational Databases90 Questions
Exam 5: Computer Fraud and Security95 Questions
Exam 6: Control and Accounting Information Systems87 Questions
Exam 7: Infromation System Controls for Systems Reliability82 Questions
Exam 8: Auditing Computer-Based Information Systems77 Questions
Exam 9: Auditing Computer-Based Informtion Systems94 Questions
Exam 10: The Revenue Cycle: Sales an Cash Collections94 Questions
Exam 11: The Expenditure Cycle: Purchasing and Cash Disbursements89 Questions
Exam 12: The Production Cycle87 Questions
Exam 13: The Human Resources Managementpayroll Cycle93 Questions
Exam 14: General Ledger and Reporting System81 Questions
Exam 15: Data Modeling and Database Design80 Questions
Exam 16: Implementing an Rea Model in a Relational Database77 Questions
Exam 17: Special Topics in Rea Modeling77 Questions
Exam 18: Introduction to Systems Development and Systems Analysis94 Questions
Exam 19: Ais Development Strategies95 Questions
Exam 20: Systems Design, Implementation and Operation86 Questions
Select questions type
Discuss the aspects that must be considered during a feasibility study.
(Essay)
4.9/5
(29)
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? 

(Multiple Choice)
4.9/5
(38)
What is the physical design stage of the systems development life cycle?
(Essay)
4.8/5
(26)
The question of what the project should and should not accomplish is determined in what step of systems analysis?
(Multiple Choice)
4.8/5
(35)
What is the basic model used to create a framework for economic feasibility analysis?
(Multiple Choice)
4.9/5
(22)
What is the role of the information systems steering committee?
(Multiple Choice)
4.9/5
(30)
Shortly after a new automated quality assurance system went online,production output declined by three percent.The production manager,a long time employee,blamed the new system.He argued that "after we laid off Tom and Jimmy and put this machine in,things just slowed down.Nothing seems to work right anymore." This is an example of dealing with change by
(Multiple Choice)
4.8/5
(29)
When would a company go through a systems development life cycle?
(Multiple Choice)
4.8/5
(40)
Systems development planning is an important step in the SDLC for a number of reasons.When management is better prepared for future resource needs and employees are better prepared for the changes that will occur,it can be said that the systems development planning has
(Multiple Choice)
4.9/5
(30)
It is important for the systems analyst to determine AIS system objectives so that everyone involved can focus on the elements most vital to the system's success.The __________ objective states that crucial information should be produced first and then less important items as time permits.
(Multiple Choice)
4.8/5
(38)
Which of the following is the most important and frequently analyzed aspect of a feasibility study?
(Multiple Choice)
4.7/5
(27)
Discuss the role of the groups that influence the development and implementation of an AIS.
(Essay)
4.8/5
(23)
In which phase of the systems development life cycle are the new hardware and software for a system tested?
(Multiple Choice)
4.8/5
(27)
On March 18,2008,a newly installed robotic painting system broke down.A technician was called to repair the system.She found that a shoe had been shoved into the system's innards.This is an example of dealing with change by
(Multiple Choice)
4.9/5
(28)
In which phase of the systems development life cycle is the feasibility study first performed?
(Multiple Choice)
4.9/5
(46)
What are some of the reasons why behavioral problems occur when a new AIS is introduced?
(Essay)
4.8/5
(39)
What is the basic building block of information systems planning?
(Multiple Choice)
4.8/5
(37)
A planning horizon of at least __________ years is reasonable for any master plan; however,the plan should be updated at least __________ each year.
(Multiple Choice)
4.9/5
(28)
Showing 61 - 80 of 94
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)