Myopic behaviour occurs when

(Multiple Choice)
4.9/5
(38)

When the reaction to a budget is negative, resulting in managerial behaviour that is negative for the organization, the resulting behaviour is known as

(Multiple Choice)
4.7/5
(30)

The ideal budget system creates

(Multiple Choice)
4.8/5
(44)

Klamaty, SA., is looking for feedback on performance. The company compares the budget for the year with the actual costs. Klamaty, SA., had the following budgeted data: Required: Klamaty, SA., is looking for feedback on performance. The company compares the budget for the year with the actual costs. Klamaty, SA., had the following budgeted data: Required:     a. Prepare a performance report for all costs showing static budget variances. b. Prepare a performance report for all costs showing flexible budget variances. a. Prepare a performance report for all costs showing static budget variances. b. Prepare a performance report for all costs showing flexible budget variances.

(Essay)
5.0/5
(41)

What is budgetary slack? Why does it occur? What is the primary indication that budgetary slack is occurring?

(Essay)
4.9/5
(38)

Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data: The following actually occurred: Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data: The following actually occurred:   The static budget for total variable costs is  The static budget for total variable costs is Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data: The following actually occurred:   The static budget for total variable costs is

(Multiple Choice)
4.8/5
(42)

Which of the following is NOT a key feature of an ideal budgetary system?

(Multiple Choice)
4.9/5
(42)

Which of the following must be addressed if budgets are to be used in performance evaluation?

(Multiple Choice)
4.7/5
(38)

Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders   What is the budget variance for machining in an activity-based performance report?  What is the budget variance for machining in an activity-based performance report? Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders   What is the budget variance for machining in an activity-based performance report?

(Multiple Choice)
4.8/5
(38)

If production was budgeted at 400 units and the actual production was 420 units, what would be the static budget variance for materials if the actual cost of materials was £4,150 and the budgeted cost per unit is £10?

(Multiple Choice)
4.9/5
(37)

Riemay, SA., has done a cost analysis for its production of sports cards. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 cards: 60 labour hours; 500 machine hours; 5 batches; 30 purchase orders Riemay, SA., has done a cost analysis for its production of sports cards. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 cards: 60 labour hours; 500 machine hours; 5 batches; 30 purchase orders    The following variances were given in the activity performance report:    Required: Find the missing values. Prepare an activity-based performance report in good form   The following variances were given in the activity performance report: Riemay, SA., has done a cost analysis for its production of sports cards. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 cards: 60 labour hours; 500 machine hours; 5 batches; 30 purchase orders    The following variances were given in the activity performance report:    Required: Find the missing values. Prepare an activity-based performance report in good form   Required: Find the missing values. Prepare an activity-based performance report in good form Riemay, SA., has done a cost analysis for its production of sports cards. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 cards: 60 labour hours; 500 machine hours; 5 batches; 30 purchase orders    The following variances were given in the activity performance report:    Required: Find the missing values. Prepare an activity-based performance report in good form

(Essay)
4.8/5
(39)

Which cost centre listed below is evaluated with the aid of flexible budgets drawn up for the actual level of activity?

(Multiple Choice)
4.7/5
(43)

A flexible-based budgeting system

(Multiple Choice)
4.8/5
(39)

Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders   What is the budget variance for setups in an activity-based performance report?  What is the budget variance for setups in an activity-based performance report? Harald, SA., has done a cost analysis for its production of bumper stickers. The following activities and cost drivers have been developed: Following are the actual costs of producing 85,000 stickers: 5,000 machine hours; 10 batches; 20 purchase orders   What is the budget variance for setups in an activity-based performance report?

(Multiple Choice)
4.8/5
(33)

What is the best description listed below of a discretionary cost centre?

(Multiple Choice)
4.8/5
(33)

Villafane, SA., has done a cost analysis for its production of decals. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 decals: 1,000 machine hours; 5 batches; 30 purchase orders Villafane, SA., has done a cost analysis for its production of decals. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 decals: 1,000 machine hours; 5 batches; 30 purchase orders   The following variances were given in the activity performance report:   What is the actual cost of setups?  The following variances were given in the activity performance report: Villafane, SA., has done a cost analysis for its production of decals. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 decals: 1,000 machine hours; 5 batches; 30 purchase orders   The following variances were given in the activity performance report:   What is the actual cost of setups?  What is the actual cost of setups? Villafane, SA., has done a cost analysis for its production of decals. The following activities and cost drivers have been developed: Following are the actual costs of producing 35,000 decals: 1,000 machine hours; 5 batches; 30 purchase orders   The following variances were given in the activity performance report:   What is the actual cost of setups?

(Multiple Choice)
4.9/5
(43)

If production was budgeted at 400 units and the actual production was 420 units, what would be the flexible budget variance for materials if the actual cost of materials was £4,150 and the budgeted cost per unit is £10?

(Multiple Choice)
4.8/5
(40)

Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data: The following actually occurred: Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data: The following actually occurred:   The static budget variance for direct materials is  The static budget variance for direct materials is Armati, SA., is looking for feedback on company performance. The company compares the budget for the year with the actual costs. Data have been collected below: Armati, SA., had the following budgeted data: The following actually occurred:   The static budget variance for direct materials is

(Multiple Choice)
4.9/5
(31)

Which of the following departments is likely to be evaluated as a discretionary cost centre?

(Multiple Choice)
4.9/5
(44)

Which of the following is not an objective of responsibility accounting?

(Multiple Choice)
4.7/5
(31)