Exam 10: Standard Costing: a Managerial Control Tool

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What formula is used to determine the usage variance?

(Multiple Choice)
4.8/5
(35)

A favourable usage variance would occur when the actual usage of inputs is greater than the standard usage.

(True/False)
4.8/5
(29)

Match the variance with its correct calculation. -Materials usage variance

(Multiple Choice)
4.8/5
(43)

Historical experience may provide an initial guideline for setting standards,but it should be used with caution.

(True/False)
4.8/5
(40)

To compute the standard direct labour hours allowed,multiply the unit labour standard by the standard output.

(True/False)
4.9/5
(33)

Match each item with the correct statement below. -These reflect the amount of input that should be used per unit of output.

(Multiple Choice)
4.8/5
(39)

Why are standard cost systems adopted?

(Multiple Choice)
4.8/5
(42)

In general,who controls the use of labour in an organization?

(Multiple Choice)
4.8/5
(33)

Match each item with the correct statement below. -A tool used to provide the production data needed to calculate the standard unit cost.

(Multiple Choice)
4.9/5
(39)

Direct materials ( 2 sheets of glass ($2 (\$ 2 per sheet) \quad$4 \$ 4 Direct labour (3 hours @$8 @ \$ 8 per hour) \quad\quad\quad\quad\quad 24 -Refer to the Figure.What was Perfect Builders' labour rate variance?

(Multiple Choice)
4.8/5
(30)

To determine whether variances are significant,managers set control limits,which represent the acceptable range,plus or minus an allowable deviation.

(True/False)
4.7/5
(34)

Which of the following is NOT characteristic of normal costing systems?

(Multiple Choice)
4.7/5
(42)

In kaizen costing,each period's Kaizen standard is based on prior periods' improvement,thereby locking in these improvements.

(True/False)
4.8/5
(31)

Match the variance with its correct calculation. -Total materials variance

(Multiple Choice)
4.8/5
(44)

The sum of the material price and material usage variances will add up to the total materials variance only if the materials purchased is equal to the materials used.

(True/False)
4.8/5
(50)

Ponte Company produced 2,500 widgets during December using 4,000 units of materials at a cost of $5.00 each.It also used 5,000 direct labour hours at a rate of $7.00 per hour.Its direct materials standard is 2 units per widget.Its direct labour standard is 2.5 hours per widget. Its materials price variance was a favourable $8,000,and its labour rate variance was an unfavourable $1,000. Ponte Company produced 2,500 widgets during December using 4,000 units of materials at a cost of $5.00 each.It also used 5,000 direct labour hours at a rate of $7.00 per hour.Its direct materials standard is 2 units per widget.Its direct labour standard is 2.5 hours per widget. Its materials price variance was a favourable $8,000,and its labour rate variance was an unfavourable $1,000.

(Essay)
4.9/5
(39)

Which of the following statements is characteristic of control limits?

(Multiple Choice)
5.0/5
(39)

Direct materials ( 5 m5 \mathrm {~m} of denim @$2@ \$ 2 per metre) \quad$10\$ 10 Direct labour (3 hours @$6@ \$ 6 per hour) \quad\quad\quad\quad\quad 18 -Refer to the Figure.What is Allan's materials price variance?

(Multiple Choice)
4.8/5
(35)

Rayvo Company has the following information: Direct Materials: Direct Labour: Standard Quantity 100,000 Standard Hours 1,000 Actual Quantity 99,500 Actual Hours 1,050 Standard Price \ 5 Standard Rate \ 12 Actual Price \ 4 Actual Rate \ 13 A. Determine the materials price variance and whether it is favourable or unfavourable. B. Determine the materials usage variance and whether it is favourable or unfavourable. C. Determine the labour rate variance and whether it is favourable or unfavourable. D. Determine the labour efficiency variance and whether it is favourable or unfavourable. E. Provide the journal entries to record the purchase of materials, the issuance and usage of materials, and direct labour variances. F. Provide the closing entries for the immaterial variances.

(Essay)
4.9/5
(38)

Direct materials ( 2 sheets of glass ($2 (\$ 2 per sheet) \quad$4 \$ 4 Direct labour (3 hours @$8 @ \$ 8 per hour) \quad\quad\quad\quad\quad 24 -Refer to the Figure.What is Aqua's labour rate variance?

(Multiple Choice)
4.8/5
(37)
Showing 141 - 160 of 174
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)