Exam 10: Standard Costing: a Managerial Control Tool
Exam 1: Introduction to Managerial Accounting45 Questions
Exam 2: Basic Managerial Accounting Concepts156 Questions
Exam 3: Cost Behaviour186 Questions
Exam 4: Costvolumeprofit Analysis: a Managerial Planning Tool160 Questions
Exam 5: Job-Order Costing176 Questions
Exam 6: Process Costing157 Questions
Exam 7: Activity-Based Costing and Management155 Questions
Exam 8: Absorption and Variable Costing,and Inventory Management88 Questions
Exam 9: Budgeting, production, cash, and Master Budget166 Questions
Exam 10: Standard Costing: a Managerial Control Tool174 Questions
Exam 11: Flexible Budgets and Overhead Analysis149 Questions
Exam 12: Performance Evaluation and Decentralization145 Questions
Exam 13: Short-Run Decision Making: Relevant Costing149 Questions
Exam 14: Capital Investment Decisions153 Questions
Select questions type
Managers develop quantity standards when they decide what amount of input should be used per unit of output.
(True/False)
4.8/5
(37)
Jersey Company produced 1,000 trash cans during April using 450 direct labour hours and 3,100 kg of rubber.Its materials and labour standards are as follows:
Its materials price variance was a favourable $620 and its labour rate variance was an unfavourable $900. 


(Essay)
4.9/5
(36)
Which formula is used to compute the standard quantity of materials allowed?
(Multiple Choice)
4.9/5
(28)
Min Company has developed the following standards for one of its products. Direct materials: 15\times\ 17.50 per kilogram Direct labour: 4 hours \times\ 24 per hour Variable manufacturing overhead: 4 hours \times\ 14 per hour The following activity occurred during the month of November: Materials purchased: 20,000 costing \ 340,000 Materials used: 7,200 Units produced: 500 units Direct labour: 2,300 hours at \ 23.60 per hour The company records materials price variances at the time of purchase.What is the direct materials price variance?
(Multiple Choice)
4.9/5
(39)
Which formula is used to calculate the labour rate variance?
(Multiple Choice)
4.9/5
(40)
Match each item with the correct statement below.
-This reflects the planned improvement that is set,which will help reduce non-value-added costs.
(Multiple Choice)
4.8/5
(42)
Which of the following statements is characteristic of currently attainable standards?
(Multiple Choice)
4.9/5
(33)
Which variance is the difference between the actual cost of the input and its planned cost?
(Multiple Choice)
4.8/5
(48)
Direct materials ( 2 sheets of glass per sheet)
Direct labour (3 hours per hour) 24
-Refer to the Figure.What is the journal entry to record the purchase of materials?
(Multiple Choice)
4.8/5
(44)
One reason for adopting a standard cost system is to make product costing easier.
(True/False)
4.8/5
(29)
A kaizen standard reflects the realized improvements for the past periods and a search for more improvements for the future.
(True/False)
4.8/5
(35)
Hair of the K9 manufactures dog food.During the month,it manufactured 3,000 bags of kibble,using 0.25 hours of direct labour per bag at a rate of $9.00 per hour.The materials and labour standards for manufacturing the bags of kibble are as follows: Direct materials ( 1 of beef (\ 1.00 per kilogram) \ 1.00 Direct materials (1@\ 0.25 per bag) 0.25 Direct labour (0.30 hour @\ 9.00 per hour ) 2.70 The company actually used 3,300 kg of beef at a price of $1.10 per kilogram.It also purchased 3,000 bags at a price of $0.15 per bag. A. Determine the total materials price variance and whether it is favourable or unfavourable.
B. Determine the materials usage variance for beef and whether it is favourable or unfavourable.
C. Determine the labour rate variance and whether it is favourable or unfavourable.
D. Determine the labour efficiency variance and whether it is favourable or unfavourable.
(Essay)
4.8/5
(36)
Direct materials ( of denim per metre)
Direct labour (3 hours per hour) 18
-Refer to the Figure.What is the entry to record the purchase of materials?
(Multiple Choice)
4.7/5
(37)
Assume that SQ = Standard Quantity,SP = Standard Price,AQ = Actual Quantity,and AP = Actual Price.Also assume a favourable materials usage variance.Which of the following would be the journal entry and the equation to record the issuance and usage of materials?
(Multiple Choice)
4.9/5
(30)
Action Company's standard cost is $600,000.The allowable deviation is ±10%.Its actual costs for three months are as follows: April \ 520,000 May \ 550,000 June \ 575,000 What are the upper and lower control limits,respectively?
(Multiple Choice)
4.9/5
(38)
Baker Company adopted a standard cost system several years ago.The standard costs for the prime costs of its single product follow: Material: per kilogram
Labour: 6 hours per hour The following operating data were taken from the records for December:
1.
Units completed:
5,800 units
2.
Budgeted output:
6,000 units
3.
Materials purchased:
60,000 kg
4.
Total actual labour costs:
$306,600
5.
Actual hours of labour:
36,500 hours
6.
Material usage variance:
$2,250 unfavourable
7.
Total material variance:
$450 unfavourable
Compute the following: A. Labour rate variance
B. Labour efficiency variance
C. Actual kilograms of material used in the production process
D. Actual cost paid per kilogram of material
(Essay)
4.9/5
(35)
Direct materials ( of denim per metre)
Direct labour (3 hours per hour) 18
-Refer to the Figure.What is Allan's materials usage variance?
(Multiple Choice)
4.9/5
(37)
Showing 41 - 60 of 174
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)