Exam 19: Balanced Scorecard: Quality and Time
Exam 1: The Manager and Management Accounting195 Questions
Exam 2: An Introduction to Cost Terms and Purposes224 Questions
Exam 3: Cost-Volume-Profit Analysis209 Questions
Exam 4: Job Costing203 Questions
Exam 5: Activity-Based Costing and Activity-Based Management176 Questions
Exam 6: Master Budget and Responsibility Accounting226 Questions
Exam 7: Flexible Budgets,direct-Cost Variances,and Management Control181 Questions
Exam 8: Flexible Budgets, overhead Cost Variances, and Management Control171 Questions
Exam 9: Inventory Costing and Capacity Analysis207 Questions
Exam 10: Determining How Costs Behave192 Questions
Exam 11: Decision Making and Relevant Information218 Questions
Exam 12: Strategy,balanced Scorecard,and Strategic Profitability Analysis172 Questions
Exam 13: Pricing Decisions and Cost Management209 Questions
Exam 14: Cost Allocation, customer-Profitability Analysis, and Sales-Variance Analysis167 Questions
Exam 15: Allocation of Support-Department Costs, common Costs, and Revenues150 Questions
Exam 16: Cost Allocation: Joint Products and Byproducts150 Questions
Exam 17: Process Costing149 Questions
Exam 18: Spoilage, rework, and Scrap153 Questions
Exam 19: Balanced Scorecard: Quality and Time150 Questions
Exam 20: Inventory Management, just-In-Time, and Simplified Costing Methods150 Questions
Exam 21: Capital Budgeting and Cost Analysis151 Questions
Exam 22: Management Control Systems, transfer Pricing, and Multinational Considerations150 Questions
Exam 23: Performance Measurement, compensation, and Multinational Considerations150 Questions
Select questions type
Which of the following correctly describes customer-response time?
(Multiple Choice)
4.9/5
(43)
Which of the following is not true regarding balanced scorecard measures?
(Multiple Choice)
4.8/5
(38)
Managers looking to reduce defective units produced at bottleneck operations would most likely be monitoring internal-business-process measures on the balanced scorecard.
(True/False)
4.8/5
(28)
Relevant-cost and relevant-revenue analysis uses the allocated costs as the base for calculating the costs of a quality improvement program.
(True/False)
4.8/5
(36)
The amount of time from when a customer places an order for a product to when the product or service is delivered to the customer is referred to as ________.
(Multiple Choice)
4.9/5
(35)
Captain Carl's Seascapes produces sea pictures for sale through catalogs.The company has two workstations,photo production and framing.The photo production station is limited by the speed of operating the photo development machine.Framing is limited by the speed of the employees.Framing normally waits for work from photo production.Each department works an eight-hour day.If Captain Carl's Seascapes adds an earlier half shift so that photo production begins work four hours earlier than framing each day,the two departments generally finish their work at about the same time.Not only does this eliminate the bottleneck,but it also increases finished units produced each day by 220 units.All units produced can be sold.The cost of operating the photo production department four more hours each day is $1250.The contribution margin of the finished products is $20 each.
What is the total production per day if the change is made?
(Multiple Choice)
4.7/5
(35)
The two basic aspects of quality are quality of design and conformance quality.Define and give an example of each.
(Essay)
4.9/5
(36)
Which of the following is an example of a nonfinancial measure for customer satisfaction?
(Multiple Choice)
4.9/5
(37)
Which of the following is a learning-and-growth measure to study the output during bottleneck situations?
(Multiple Choice)
4.8/5
(41)
The implication of controlling a process at a Six Sigma level is that the process produces only 3.4 defects per million products produced.
(True/False)
4.8/5
(37)
In the banking industry,depositing a customer's check into the wrong bank account is an example of quality of design failure.
(True/False)
4.7/5
(31)
Which of the following is a graph of a series of successive observations of a particular step,procedure,or operation taken at regular intervals of time?
(Multiple Choice)
4.7/5
(34)
The tool crib at a large manufacturing company is responsible for providing tools to the factory workers on demand.The tool crib has a variable demand.Historically,its demand has ranged from 220 to 500 small tools per day with an average of 360.Diane,the tool crib attendant,works eight hours a day,five days a week.Each order is for one small tool and each small tool takes Diane 1 minute to retrieve from the bins.
Diane has been asked to consider plans to add the retrieval of larger tooling fixtures to her duties.She anticipates that there would be an average of 10 tooling fixtures per day requested.Each tooling fixture would take Diane 4 minutes to retrieve.
What is the average waiting time,in minutes,if Diane continues to be the only worker that would retrieve the small tools as well as the larger tooling fixtures?
(Multiple Choice)
4.8/5
(31)
Which of the following is an internal-business-process measure to study the output during bottleneck situations?
(Multiple Choice)
4.8/5
(37)
Acme Janitor Service has always taken pride in the fact that it had one of the highest customer response times in the home cleaning service industry.However,as the products manufactured for this industry have become more complex,the company's customer response time has declined.
Required:
Why do you think that response time declined if all other quality factors have remained the same?
(Essay)
4.9/5
(36)
Nonfinancial measures are ineffective at helping managers evaluate how well they have done on goals such as improving manufacturing cycle times and customer response times.
(True/False)
4.9/5
(35)
Showing 81 - 100 of 150
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)