Exam 19: Balanced Scorecard: Quality and Time

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

One way to increase capacity is to reduce the time it takes for setups and processing.

(True/False)
4.7/5
(36)

An illustration that resembles the bone structure of a fish and identifies potential reasons why a problem exists is called ________.

(Multiple Choice)
4.8/5
(37)

Spoilage,rework,scrap,and machine repairs are all examples of ________.

(Multiple Choice)
4.8/5
(33)

Baby Care Products has just completed a very successful program of improving quality in its manufacturing operations.The next step is to improve the operations of its administrative functions,starting with the accounting information system.As the manager of the accounting operations,you are requested to begin a quality improvement program. Required: What are some possibilities of finding out about the current status of quality in the accounting system?

(Essay)
4.9/5
(44)

Any factor where a change in the factor causes a change in the speed with which an activity is undertaken is referred to as ________.

(Multiple Choice)
4.9/5
(29)

Tony placed an order for a customized watch.The customer response time is 43 hours,its receipt time is 9 hours,and manufacturing cycle time is 25 hours.Calculate the delivery time of the product.

(Multiple Choice)
4.7/5
(37)

Ventaz Corp manufactures small windows for back yard sheds.Historically,its demand has ranged from 30 to 50 windows per day with an average of 41.Alex is one of the production workers and he works eight hours a day,five days a week.Each order is one window and each window takes 10 minutes. What is the cycle time for an order?

(Multiple Choice)
4.9/5
(30)

Process engineering is an example of ________.

(Multiple Choice)
4.8/5
(37)

An on-time delivery rate is considered a nonfinancial measure of customer satisfaction.

(True/False)
4.7/5
(26)

Customer response time is the time it takes from the time a customer places an order for a product or service to the time the product or service is delivered to the customer.

(True/False)
4.7/5
(39)

Prevention costs include inspection and product testing.

(True/False)
4.7/5
(27)

Two common operational measures of time are customer-response time and on-time performance.

(True/False)
4.9/5
(30)

Brown Laundry has a variable demand.The daily demand ranges from 100 to 140 customers a day with an average of 5 items.The average daily demand is 110 customers.The laundry operates 10 hours a day.Each order takes approximately 5 minutes. Required: a.What is the average customer waiting time,in minutes? b.What is the cycle time for an order? c.The manager has decided that the waiting time is too long and has increased the workday to 11 hours.What is the waiting time now? Will the customers be any happier?

(Essay)
4.8/5
(19)

Ventaz Corp manufactures small windows for back yard sheds.Historically,its demand has ranged from 30 to 50 windows per day with an average of 43.Alex is the one production worker and he works eight hours a day,five days a week.Each order is one window and each window takes 5 minutes. What is the average waiting time in minutes?

(Multiple Choice)
4.7/5
(35)

Which of the following true of nonfinancial measures of quality?

(Multiple Choice)
4.9/5
(39)

Cysco Corp has a budget of $1,207,000 in 2017 for prevention costs.If it decides to automate a portion of its prevention activities,it will save $106,000 in variable costs.The new method will require $50,200 in training costs and $143,000 in annual equipment costs.Management is willing to adjust the budget for an amount up to the cost of the new equipment.The budgeted production level is 201,000 units. Appraisal costs for the year are budgeted at $503,000.The new prevention procedures will save appraisal costs of $50,600.Internal failure costs average $34 per failed unit of finished goods.The internal failure rate is expected to be 6% of all completed items.The proposed changes will cut the internal failure rate by one-half.Internal failure units are destroyed.External failure costs average $58 per failed unit.The company's average external failures average 2.5% of units sold.The new proposal will reduce this rate to 2%.Assume all units produced are sold and there are no ending inventories. How much will appraisal costs change assuming that the new prevention methods reduce material failures by 40% in the appraisal phase?

(Multiple Choice)
4.8/5
(34)

Longer manufacturing cycle times can result in ________.

(Multiple Choice)
4.8/5
(42)

Norton's Convenience store has a variable demand.The daily demand ranges from 270 to 330 customers a day who average purchasing 5 items each.The average daily demand is 300 customers.The convenience store currently operates 12 hours a day.Each order takes approximately 2 minutes. Required: a.What is the average customer waiting time,in minutes? b.What is the cycle time for an order? c.Norton has decided that the waiting time is too long and has increased the hours the store is open to 15 hours.What is the waiting time now?

(Essay)
4.9/5
(37)

Warranty repair cost is an example of which of the following?

(Multiple Choice)
4.9/5
(39)

Which of the following is an advantage of COQ measures?

(Multiple Choice)
4.8/5
(36)
Showing 61 - 80 of 150
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)