Exam 19: Balanced Scorecard: Quality and Time
Exam 1: The Manager and Management Accounting195 Questions
Exam 2: An Introduction to Cost Terms and Purposes224 Questions
Exam 3: Cost-Volume-Profit Analysis209 Questions
Exam 4: Job Costing203 Questions
Exam 5: Activity-Based Costing and Activity-Based Management176 Questions
Exam 6: Master Budget and Responsibility Accounting226 Questions
Exam 7: Flexible Budgets,direct-Cost Variances,and Management Control181 Questions
Exam 8: Flexible Budgets, overhead Cost Variances, and Management Control171 Questions
Exam 9: Inventory Costing and Capacity Analysis207 Questions
Exam 10: Determining How Costs Behave192 Questions
Exam 11: Decision Making and Relevant Information218 Questions
Exam 12: Strategy,balanced Scorecard,and Strategic Profitability Analysis172 Questions
Exam 13: Pricing Decisions and Cost Management209 Questions
Exam 14: Cost Allocation, customer-Profitability Analysis, and Sales-Variance Analysis167 Questions
Exam 15: Allocation of Support-Department Costs, common Costs, and Revenues150 Questions
Exam 16: Cost Allocation: Joint Products and Byproducts150 Questions
Exam 17: Process Costing149 Questions
Exam 18: Spoilage, rework, and Scrap153 Questions
Exam 19: Balanced Scorecard: Quality and Time150 Questions
Exam 20: Inventory Management, just-In-Time, and Simplified Costing Methods150 Questions
Exam 21: Capital Budgeting and Cost Analysis151 Questions
Exam 22: Management Control Systems, transfer Pricing, and Multinational Considerations150 Questions
Exam 23: Performance Measurement, compensation, and Multinational Considerations150 Questions
Select questions type
Longer manufacturing cycle times increase the inventory carrying costs and decrease revenues.
(True/False)
4.9/5
(45)
The time it takes the marketing department to specify to the manufacturing department the exact requirements of the customer's order is referred as ________.
(Multiple Choice)
4.9/5
(29)
Venlaz Corp makes small motorcycles.The monthly demand ranges from 80 to 100 motorcycles.The average demand is 92 motorcycles.The plant operates 300 hours a month.Each cycle takes approximately 1.5 hours.
If the company adds a new line of scooters,initial demand will be 20 per month.Each scooter will take 1 hour to make.To offset approaching production capacity,expanding the assembly line is possible.This will decrease manufacturing time for all products by 20%.However,this will increase the costs of cycles from $400 to $500 and scooters from $200 to $240.The change will also cause increases in prices from $700 to $750 for cycles and from $450 to $500 for scooters.
Required:
a.What is the average waiting time for cycles if they are the only item manufactured?
b.What are the average waiting times if both cycles and scooters are produced and the assembly line is not enlarged?
c.What are the average waiting times if both cycles and scooters are produced and the assembly line is enlarged?
d.What is the expected monthly margin without scooters if the company sells all 92 cycles it manufactures?
e.What are the expected monthly contribution margins if scooters are made with the current assembly line and with the new assembly line? Assume average sales and that sales equal production.
f.What action do you recommend?
(Essay)
4.9/5
(44)
The time from which a machine is setup for order till the product becomes a manufactured good is ________.
(Multiple Choice)
4.8/5
(37)
COQ measures such as measures of customer satisfaction and employee satisfaction are useful indicators of long-run performance.
(True/False)
4.7/5
(29)
The last step of the five-step decision making process is implementing the decision,evaluating performance,and learning.How can a balanced scorecard play a role in helping to assure this final step will be successful?
(Essay)
4.8/5
(35)
ISO 9000 developed by the International Organization for Standardization is a set of five international standards for quality management.
(True/False)
4.9/5
(34)
Zenich Corp manufactures laptops.The waiting time is 72 minutes before the start of production and the manufacturing lead time is 164 minutes per laptop.What is its manufacturing cycle efficiency? (Round to the nearest whole percent. )
(Multiple Choice)
4.9/5
(39)
Distribution of questionnaires to customers regarding product quality and improving the product on certain key areas based on the inferences drawn from the questionnaires is an example of a nonfinancial measure of quality.
(True/False)
4.9/5
(42)
Appraisal costs are costs incurred to preclude the production of products that do not conform to specifications.
(True/False)
4.8/5
(32)
A patient had a 1:00 pm appointment with a doctor and leaves the office to go home at 2:00 pm.The patient spends 5 minutes filling out insurance forms,25 minutes alone in the examination room,and 6 minutes with the nurse and doctor.What is the service cycle efficiency ratio?
(Multiple Choice)
4.7/5
(36)
Costs of quality (COQ)reports usually consider opportunity costs.
(True/False)
4.8/5
(31)
LaCrosse Products has a budget of $907,000 in 2017 for prevention costs.If it decides to automate a portion of its prevention activities,it will save $80,700 in variable costs.The new method will require $40,200 in training costs and $102,000 in annual equipment costs.Management is willing to adjust the budget for an amount up to the cost of the new equipment.The budgeted production level is 155,000 units.
Appraisal costs for the year are budgeted at $600,000.The new prevention procedures will save appraisal costs of $50,000.Internal failure costs average $15 per failed unit of finished goods.The internal failure rate is expected to be 2% of all completed items.The proposed changes will cut the internal failure rate by one-third.Internal failure units are destroyed.External failure costs average $54 per failed unit.The company's average external failures average 2% of units sold.The new proposal will reduce this rate by 45%.Assume all units produced are sold and there are no ending inventories.
How much will internal failure costs change if the internal product failures are reduced by 1/3 with the new procedures? (Do not round intermediate calculations. )
(Multiple Choice)
4.8/5
(31)
Conformance quality is the performance of a product or service relative to its design and product specifications.
(True/False)
4.9/5
(36)
Which of the following is the mathematical expression for calculating manufacturing cycle efficiency (MCE)?
(Multiple Choice)
4.9/5
(37)
Showing 101 - 120 of 150
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)