Setting a new minimum standard is which step in the kaizen cycle of kaizen costing?

(Multiple Choice)
4.8/5
(36)

Warwick Company has the following information concerning its direct labour: Warwick Company has the following information concerning its direct labour:    A. Determine the labour rate variance and whether it is favourable or unfavourable. B. Determine the labour efficiency variance and whether it is favourable or unfavourable. C. Provide the journal entry for the labour variances. A. Determine the labour rate variance and whether it is favourable or unfavourable. B. Determine the labour efficiency variance and whether it is favourable or unfavourable. C. Provide the journal entry for the labour variances.

(Essay)
4.7/5
(39)

Which department is responsible for setting price standards for materials and labour?

(Multiple Choice)
4.7/5
(39)

During November,10,000 direct labour hours were worked at a standard cost of $10 per hour.Suppose the direct labour rate variance for November was $4,000 unfavourable.What was the actual cost per direct labour hour?

(Multiple Choice)
4.9/5
(35)

Aqua Company produces aquariums. During the year, 150,000 aquariums were produced. Materials and labour standards for producing the aquariums are as follows: Aqua purchased and used 310,000 sheets of glass at $1.50 per sheet, and its actual labour hours were 435,000 hours at a wage rate of $8.50 per hour. Direct materials ( 2 sheets of glass @ \ 2 per sheet) \ 4 Direct labour (3 hours @\ 8 per hour) 24 -Refer to the Figure.What is Aqua's labour rate variance?

(Multiple Choice)
4.8/5
(36)

During March, a small roofing company purchased 700 bundles of a certain type of shingle at a price of $35 per bundle, $8 more than the standard price. The company's standard quantity of this type of shingles is 725 bundles. -Refer to the Figure.What is the journal entry to record the issuance and usage of materials?

(Multiple Choice)
4.9/5
(45)

Which of the following is characteristic of direct labour variances?

(Multiple Choice)
4.9/5
(30)

Match each item with the correct statement below. -This reflects the planned improvement that is set,which will help reduce non-value-added costs.

(Multiple Choice)
4.8/5
(37)

If a process-costing system uses standard costing to assign product costs,there is no need to compute a unit cost for each equivalent unit cost category since a standard unit cost would exist for each category.

(True/False)
4.8/5
(40)

Suppose the actual labour rate exceeds the standard labour rate,and the actual labour hours exceed the number of hours allowed.What would be the labour rate variance and labour efficiency variance? Labour Rate Labour Efficiency Variance Variance

(Multiple Choice)
4.7/5
(35)

What is target cost?

(Multiple Choice)
5.0/5
(30)

Which of the following provides both the production data needed to calculate the standard unit cost and the underlying details for the standard cost per unit?

(Multiple Choice)
4.8/5
(34)

Bear Company uses a standard costing system. The following information pertains to direct labour costs for the month of March: Standard direct labour rate per hour \ 15.00 Actual direct labour rate per hour \ 13.50 Labour rate vari ance \ 18,000 favourable Actual output 1,000 units Standard hours allowed for actual production 10,000 hours -Refer to the Figure.What is the total labour budget variance for Bear Company?

(Multiple Choice)
4.9/5
(32)

Determine if the variance is favourable or unfavourable. -Actual usage of inputs is greater than the standard usage.

(Multiple Choice)
4.7/5
(37)

Bi-land Company's standard cost is $150,000. The allowable deviation is ±10%. The actual costs for six months are as follows: January \ 135,000 February 120,000 March 145,000 April 165,000 May 170,000 June 180,000 -Refer to the Figure.What is the variance that is lower than the lower control limit?

(Multiple Choice)
4.7/5
(26)

Which formula is used to calculate the labour rate variance?

(Multiple Choice)
5.0/5
(31)

Aqua Company produces aquariums. During the year, 150,000 aquariums were produced. Materials and labour standards for producing the aquariums are as follows: Aqua purchased and used 310,000 sheets of glass at $1.50 per sheet, and its actual labour hours were 435,000 hours at a wage rate of $8.50 per hour. Direct materials ( 2 sheets of glass @ \ 2 per sheet) \ 4 Direct labour (3 hours @\ 8 per hour) 24 -Refer to the Figure.What is Aqua's total labour variance?

(Multiple Choice)
4.8/5
(38)

Serenity Equestrian Corporation produces high-quality leather saddles. The company has a standard cost system and has set the following standards for materials and labour: During the year, Serenity Equestrian Corporation produced 150 saddles. Actual leather purchased was 3,100 strips at $12 per strip. There were no beginning or ending inventories of leather. Actual direct labour was 2,500 hours at $16 per hour. Leather (20 strips@ \ 15 per strip) \3 00 Direct labour ( 15 hours @\ 15 per hour) 225 Total prime cost \2 52 -Refer to the Figure.What are the labour rate variance and the labour efficiency variance,respectively?

(Multiple Choice)
4.8/5
(38)

Match each item with the correct statement below. -This is the standard plus the allowable deviation when determining whether variances are significant.

(Multiple Choice)
4.9/5
(46)

The Fantastic Tool Company (Mexico Division) produced 100,000 saw blades during the year. Each saw blade required two hours of labour at a rate of $5.50 per hour. However, the company's standard labour rate is $5.00. Its labour efficiency variance was a favourable $55,000. -Refer to the Figure.What is the journal entry to record both labour variances?

(Multiple Choice)
4.8/5
(30)
Showing 41 - 60 of 173
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)