Exam 13: Managing the Systems Development Life Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Recurring costs include all of the following except

Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
Verified

A

The accountant's role in systems analysis includes all of the following except

Free
(Multiple Choice)
4.8/5
(32)
Correct Answer:
Verified

B

A cost-benefit analysis is a part of the detailed

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

D

Systems analysis involves all of the following except

(Multiple Choice)
4.9/5
(45)

Examples of one-time costs include all of the following except

(Multiple Choice)
4.9/5
(33)

The majority of the cost of a system is incurred in the new systems development phase of the life cycle.

(True/False)
4.8/5
(46)

When the nature of the project and the needs of the user permit,most organizations will seek a pre-coded commercial software package rather than develop a system in-house.

(True/False)
4.9/5
(35)

Explain an advantage of surveying the current system when preparing a systems analysis for a new systems project.

(Essay)
4.7/5
(36)

What is competency analysis and why do managers do it.

(Essay)
4.9/5
(44)

Examples of recurring costs include

(Multiple Choice)
4.8/5
(46)

List at least three one-time costs and three recurring costs in system development.

(Essay)
4.8/5
(39)

What are three problems that account for most system failures?

(Essay)
4.8/5
(35)

Project feasibility includes all of the following except

(Multiple Choice)
5.0/5
(31)

Because of the robustness of modern technology,businesses today see infrequent changes in their IT systems and much longer system life spans.

(True/False)
4.9/5
(35)

After the systems analysis phase of the System Development Life Cycle (SDLC)is complete,the company will have a formal systems analysis report on

(Multiple Choice)
4.8/5
(32)

List four types of facts that should be gathered during an analysis of a system.

(Essay)
4.8/5
(40)

The formal product of the systems evaluation and selection phase of the Systems Development Life Cycle is

(Multiple Choice)
4.9/5
(32)

An example of a tangible benefit is

(Multiple Choice)
4.8/5
(34)

What is a systems selection report?

(Essay)
4.9/5
(43)

Recurring costs include: hardware maintenance,software acquisition,software maintenance,insurance,supplies,personnel costs.

(True/False)
4.7/5
(36)