Exam 13: Managing the Systems Development Life Cycle

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Explain the role of accountants in the conceptual design stage.

(Essay)
4.8/5
(27)

Explain the role of accountants in the conceptual design stage.

(Essay)
4.9/5
(37)

The degree of compatibility between the firm's existing procedures and personnel skills and the requirements of the new system is called

(Multiple Choice)
4.8/5
(32)

Define the feasibility measures that should be considered during project analysis and give an example of each.

(Essay)
4.8/5
(38)

Explain the five stages of the systems development life cycle?

(Essay)
4.9/5
(34)

The systems steering committee is responsible for all of the following except

(Multiple Choice)
4.9/5
(34)

Typically a systems analysis

(Multiple Choice)
4.8/5
(30)

The systems analysis report does not

(Multiple Choice)
4.9/5
(37)

Which technique is least likely to be used to quantify intangible benefits?

(Multiple Choice)
5.0/5
(31)

Contrast reactive and proactive management styles.

(Essay)
4.8/5
(32)

Instead of implementing an application in a single big-bang release,modern systems are delivered in parts continuously and quickly

(True/False)
4.8/5
(44)

Mixing technologies from many vendors improves technical feasibility.

(True/False)
4.9/5
(41)

Why is the payback method often more useful than the net present value method for evaluating systems projects?

(Essay)
4.9/5
(37)

The payback method is often more useful than the net present value method for evaluating systems projects because the effective lives of information system tend to be short and shorter payback projects are often desirable.

(True/False)
4.8/5
(37)

Protection from inadvertent disclosures of confidential information is part of the detailed

(Multiple Choice)
4.9/5
(34)

When developing the conceptual design of a system,

(Multiple Choice)
4.8/5
(41)

Intangible benefits

(Multiple Choice)
5.0/5
(39)

An example of an intangible benefit is

(Multiple Choice)
5.0/5
(37)

The systems project proposal

(Multiple Choice)
4.9/5
(40)

Explain why the Systems Development Life Cycle is of interest to accountants.What is the accountant's role in the Systems Development Life Cycle?

(Essay)
4.7/5
(35)
Showing 21 - 40 of 92
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)