Exam 2: Project Selection and Management
Exam 1: The Systems Analyst and Information Systems Development136 Questions
Exam 2: Project Selection and Management110 Questions
Exam 3: Requirements Determination153 Questions
Exam 4: Systems Analysis and Design74 Questions
Exam 5: Process Modeling112 Questions
Exam 6: Data Modeling104 Questions
Exam 7: Moving Into Design106 Questions
Exam 8: Architecture Design70 Questions
Exam 9: Dennis/wixom/roth231 Questions
Exam 10: Program Design112 Questions
Exam 11: Data Storage Design111 Questions
Exam 12: Moving Into Implementation121 Questions
Exam 13: Transition to the New System139 Questions
Exam 14: the Movement to Objects113 Questions
Select questions type
Projects can be classified by: size,cost,purpose,length,programming language and hardware platform.
(True/False)
4.7/5
(34)
Kumar is the project manager for a revised TTP system.Which of the following most likely would NOT be considered in developing a work plan?
(Multiple Choice)
4.9/5
(36)
Bob is selecting a systems analysis and design methodology.What might be the first step?
(Multiple Choice)
4.9/5
(36)
__________ are created to ensure that team members are performing tasks in the same way and following the same procedures.
(Multiple Choice)
4.7/5
(33)
In a "typical" business application development using the SDLC,you would probably spend ____ in the planning phase.
(Multiple Choice)
4.8/5
(30)
The V-model is a variation of the Waterfall Methodology that stresses testing.
(True/False)
4.9/5
(44)
The Parallel Methodology breaks the overall project into a series of release versions.
(True/False)
4.9/5
(32)
Using industry standards,the general estimated project time for the Analysis phase is 20%
(True/False)
4.8/5
(24)
A critical success factor for project management is to start with a realistic assessment of the work that needs to be accomplished.
(True/False)
4.8/5
(33)
Suggestions for motivation might include all of these EXCEPT:
(Multiple Choice)
4.8/5
(33)
The project methodology that takes the longest to complete is Extreme Programming Methodology.
(True/False)
4.7/5
(37)
Using industry standards,the general estimated project time for the Implementation phase is 30%.
(True/False)
4.8/5
(38)
The project methodology that takes the longest to complete is the Waterfall Development Methodology.
(True/False)
4.8/5
(32)
What are some things you can do to avoid conflicts on a project team?
(Essay)
4.8/5
(20)
When comparing the Waterfall methodology to the parallel methodology:
(Multiple Choice)
4.9/5
(35)
In today's organizations,an approval committee must review and monitor project progress to ensure project continuance.
(True/False)
4.9/5
(31)
Either systems prototyping or throwaway prototyping are generally a good methodology choice when the project has unclear user requirements.
(True/False)
4.8/5
(31)
Showing 41 - 60 of 110
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)