Exam 7: Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Mixed model production requires

(Multiple Choice)
4.7/5
(40)

With respect to quantities,which characteristic of JIT partnerships would be included of the following?

(Multiple Choice)
4.9/5
(38)

In the JIT facility,the next person who uses or further processes and item or information is referred to as the immediate customer.

(True/False)
4.9/5
(37)

The quality management tool called poka-yoke is not relevant to JIT systems.

(True/False)
4.9/5
(29)

According to JIT,an approach to reduce product variation is

(Multiple Choice)
4.7/5
(43)

Table 7.2 A manufacturer using a kanban system has had problems with high inventory levels of one of the component parts it makes.Daily demand for the part is 3000 units,average waiting time during production is 0.20 day,processing time is 0.10 day per container,and a container holds 150 pieces. -Use the information in Table 7.2.How many kanban containers would be required if a 10 % efficiency factor is used?

(Multiple Choice)
4.8/5
(27)

List the JIT scheduling tactics.

(Essay)
4.8/5
(33)

Lowering inventory levels in a manufacturing process typically has the effect of masking production problems such as capacity imbalances,excessive scrap and unreliable suppliers.

(True/False)
4.8/5
(39)

A kanban is a card used to control the flow of production in many just-in-time systems.

(True/False)
4.9/5
(34)

Preventive maintenance is typically given very low priority in just-in-time systems.

(True/False)
4.7/5
(36)

The reward and benefits systems in place in companies need not be reviewed with the implementation of a lean system.

(True/False)
4.9/5
(34)

One benefit of a just-in-time system is that it reduces space requirements.

(True/False)
4.8/5
(33)

Which one of the following statements is TRUE?

(Multiple Choice)
5.0/5
(35)

Companies utilizing JIT systems generally have

(Multiple Choice)
4.8/5
(31)

Table 7.1 A toy company uses a kanban system to make a metal fastener that is a component of several toys.The waiting time for a container of the fasteners during production is 0.25 day;average processing time is 0.15 day per container.Each container holds 200 fasteners.The company uses 2000 fasteners a day in the production of its product. -Use the information in Table 7.1.Using an efficiency factor of 5 %,calculate the number of kanban containers needed for the fastener.

(Multiple Choice)
4.8/5
(37)

Implementing a JIT system

(Multiple Choice)
4.9/5
(41)

A JIT II system brings the supplier into the customer's plant.

(True/False)
4.9/5
(42)

For firms along the supply chain,two aspects of lean systems that are important to manage include ________ and ________.

(Essay)
4.8/5
(37)

JIT systems maintain inventory in small lot sizes because small lot sizes

(Multiple Choice)
4.8/5
(29)

Which of the following is generally not accepted as a JIT action,when a manufacturer took the following actions to reduce inventory?

(Multiple Choice)
4.8/5
(44)
Showing 41 - 60 of 158
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)