Multiple Choice
Acceptance criteria for all project deliverables must be ____ than what is stated in the project charter or request for proposal.
A) repeated
B) described in greater detail
C) stated at higher levels
D) listed in sequence with the responsible person or organization
Correct Answer:

Verified
Correct Answer:
Verified
Q79: Scope creep<br>A) is acceptable because the informal
Q80: _ are the products or outputs that
Q81: The WBS should be decomposed to a
Q82: The lowest-level work item of any one
Q83: If the scope seems much less than
Q85: The key to quality control is to
Q86: The WBS usually indicates the organization or
Q87: The work breakdown structure can include specifications
Q88: A WBS subdivides the project into smaller
Q89: Multiple individuals should be designated the lead,