True/False
Slack is the time an activity can be delayed without impacting the completion time of the project.
Correct Answer:

Verified
Correct Answer:
Verified
Q56: Before drawing a PERT or CPM network,
Q59: An IT project requires 6 activities.The table
Q60: Given an activity's optimistic,most likely,and pessimistic time
Q61: Table 11-6 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2950/.jpg" alt="Table 11-6
Q62: Slack time in a network is the<br>A)amount
Q64: Which of the following is not a
Q65: Table 11-5 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2950/.jpg" alt="Table 11-5
Q67: Table 11-6 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2950/.jpg" alt="Table 11-6
Q68: Given an activity's optimistic,most likely,and pessimistic time
Q114: One PERT/COST assumption is that money is