Multiple Choice
Project Test Bank is composed of activities we will refer to as A, B, C, and D for convenience (and lack of creativity) . Durations and precedence requirements are shown in the table. Each of these activities can be conveniently laddered into two sub-activities of equal duration, so activity C in the original project becomes two activities, C1 and C2, each of which lasts 7 days. The first half of each activity serves as the predecessor to its second half and the first half of the original following activity. What is the difference in the late start time for activity C in the original project and activity C1 in the laddered project?
A) 3
B) 5
C) 7
D) 9
Correct Answer:

Verified
Correct Answer:
Verified
Q15: The late start time should be calculated
Q23: In order to reduce the length of
Q24: You must know the mean of an
Q49: An activity has an optimistic time estimate
Q56: One of the defining points of a
Q63: An activity has an optimistic time estimate
Q97: Use the values in the table to
Q102: Summaries for some subsets of the activities
Q103: These can be located by doing a
Q104: A gentleman farmer maniacally works on academic