Multiple Choice
Which of the following is the best statement?
A) open shop orders appear as scheduled receipts in the MRP
B) information on queue and wait time can be obtained from the work center file
C) the Gregorian calendar is suitable for production planning
D) a and b are true
E) b and c are true
Correct Answer:

Verified
Correct Answer:
Verified
Q2: The difference between backward scheduling and forward
Q3: A shows the capacity required at each
Q4: The percentage of time the work center
Q5: Rated capacity is calculated taking into account
Q6: is responsible for capacity planning at the
Q7: In one week a work center produces
Q8: Over the previous three weeks a work
Q9: A work center consists of 2 machines
Q10: is responsible for determining the capacity required
Q11: Available capacity planned to exceed capacity required