Multiple Choice
The waterfall approach is used most often for:
A) well-defined projects.
B) projects whose changes tend to be minor.
C) projects with step-by-step progress.
D) engineered products with well-defined specifications and drawings.
E) all of the these.
Correct Answer:

Verified
Correct Answer:
Verified