Multiple Choice
Without a change order clause in the Contract
A) the Owner can do whatever he/she wants
B) the Owner cannot require a change be performed by the Contractor
C) no one gets paid for changes made to the Contract
D) the contract is invalid
Correct Answer:

Verified
Correct Answer:
Verified
Q1: The Measured Mile approach utilizes costs per
Q2: Fast tracking is one method to shorten
Q3: Characteristic of a Critical Path Schedule is<br>A)
Q4: Ambiguities will always be ""construed against the
Q6: If a change affects the schedule<br>A) the
Q7: Constructive changes<br>A) have a positive effect on
Q8: A Patent Ambiguity is one that no
Q9: Float on the critical path gives everyone
Q10: The Eichleay formula was developed for<br>A) private
Q11: Fortunately, Constructive Acceleration guarantees the Contractor will