Multiple Choice
The expected out turn of 2.5 cm cement concrete floor per mansion per day
A) 2.5 sqm
B) 5.0 sqm
C) 7.5 sqm
D) 10 sqm
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q12: In long and short wall method of
Q13: The concrete work for the following part
Q14: While preparing a detailed estimate<br>A)dimension should be
Q15: According to ISI method of measurement, the
Q16: Due to change in price level, a
Q18: The value of 'A' of Indian type
Q19: The cost of the earthwork in excavation
Q20: The most reliable estimate is<br>A)detailed estimate<br>B)preliminary estimate<br>C)plinth
Q21: The value of 'C' of Indian type
Q22: Pick up the correct statement from the